Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2003
Principal Product Molded & Profile Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 41,260
Annual Production 25,000,000 Pounds
Production Hrs. Annual 7,944
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $309,393 10,416,280 kWh $0.03
Electricity Demand $164,608 19,140 kW-months/year $8.60
Natural Gas $12,164 1,434 MMBtu $8.48
TOTAL ENERGY COSTS $486,165
RECOMMENDED SAVINGS* $62,655 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,129
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $
01: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$8,991
Cost:
$2,000
$4,785 161,128 $4,206 489 - - - - - - - - - - $4,785
161,128
kWh
$4,206
489
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,603
Cost:
$6,590
$3,073 103,413 $1,343 156 - - $712 - - - $475 - - - $3,073
103,413
kWh
$1,343
156
kW-months/year
-
-
lb
$712
-
$
-
-
$
$475
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,593
Cost:
$11,310
$3,450 116,229 $1,143 133 - - - - - - - - - - $3,450
116,229
kWh
$1,143
133
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,614
Cost:
-
$2,514 84,650 $1,100 127 - - - - - - - - - - $2,514
84,650
kWh
$1,100
127
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,735
Cost:
$110
$1,307 44,000 $428 50 - - - - - - - - - - $1,307
44,000
kWh
$428
50
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,682
Cost:
-
$1,170 39,410 $512 60 - - - - - - - - - - $1,170
39,410
kWh
$512
60
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,643
Cost:
$500
$1,143 38,478 $500 58 - - - - - - - - - - $1,143
38,478
kWh
$500
58
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,612
Cost:
$150
$838 28,239 $678 79 - - $33 - - - $63 - - - $838
28,239
kWh
$678
79
kW-months/year
-
-
lb
$33
-
$
-
-
$
$63
-
$
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$555
Cost:
$825
$176 5,964 $352 41 - - $5 - - - $22 - - - $176
5,964
kWh
$352
41
kW-months/year
-
-
lb
$5
-
$
-
-
$
$22
-
$
-
-
$
10: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$430
Cost:
$1,000
$131 10,070 $299 15 - - - - - - - - - - $131
10,070
kWh
$299
15
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
11: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$255
Cost:
$590
$90 3,019 $40 5 - - $52 - - - $73 - - - $90
3,019
kWh
$40
5
kW-months/year
-
-
lb
$52
-
$
-
-
$
$73
-
$
-
-
$
12: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$204
Cost:
$9
$128 4,295 $56 6 - - $4 - - - $16 - - - $128
4,295
kWh
$56
6
kW-months/year
-
-
lb
$4
-
$
-
-
$
$16
-
$
-
-
$
13: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$15,243
Cost:
$5,500
- - - - $15,243 166,400 - - - - - - - - -
-
kWh
-
-
kW-months/year
$15,243
166,400
lb
-
-
$
-
-
$
-
-
$
-
-
$
14: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,904
Cost:
$408
- - - - $1,904 114,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,904
114,000
lb
-
-
$
-
-
$
-
-
$
-
-
$
15: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$936
Cost:
$272
- - - - $936 2,340 - - - - - - - - -
-
kWh
-
-
kW-months/year
$936
2,340
lb
-
-
$
-
-
$
-
-
$
-
-
$
16: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$612
Cost:
$2,250
- - - - $612 20,800 - - - - - - - - -
-
kWh
-
-
kW-months/year
$612
20,800
lb
-
-
$
-
-
$
-
-
$
-
-
$
17: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$8,967
Cost:
$1,000
- - - - - - - - $8,967 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$8,967
-
$
-
-
$
-
-
$
18: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$2,689
Cost:
-
- - - - - - - - - - - - $2,689 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
$2,689
-
$
19: 4.447 AUTOMATE PAYROLL SYSTEM Savings:
$1,387
Cost:
$2,500
- - - - - - $1,387 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,387
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$62,655
Cost:
$35,014
$18,805 638,895 $10,657 1,219 $18,695 303,540 $2,193 - $8,967 - $649 - $2,689 - $18,805
638,895
kWh
$10,657
1,219
kW-months/year
$18,695
303,540
lb
$2,193
-
$
$8,967
-
$
$649
-
$
$2,689
-
$
TOTAL IMPLEMENTED Savings:
$49,129
Cost:
$29,915
$13,802 470,453 $6,355 719 $18,695 303,540 $750 - $8,967 - $560 - - - $13,802
470,453
kWh
$6,355
719
kW-months/year
$18,695
303,540
lb
$750
-
$
$8,967
-
$
$560
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost