IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1707 # 09 Y:2017 09 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,235 $2,650 Implemented
UK1707 # 10 Y:2017 10 2017 OPTIMIZE PLANT POWER FACTOR $81,973 $62,685 Implemented
UK1707 # 11 Y:2017 11 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $34,216 $0 Implemented
UK1707 # 12 Y:2017 12 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,296 $2,550 Implemented
UK1707 # 13 Y:2017 13 2017 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,838 $9,700 Not Implemented
UK1707 # 14 Y:2017 14 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,084 $1,300 Not Implemented
UK1707 # 15 Y:2017 15 2017 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,522 $1,400 Not Implemented
UK1707 # 16 Y:2017 16 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,352 $0 Not Implemented
UK1707 # 17 Y:2017 17 2017 REDUCE FLUID FLOW RATES $7,372 $0 Not Implemented
UK1707 # 18 Y:2017 18 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $2,373 $0 Not Implemented
UK1707 # 19 Y:2017 19 2017 INSULATE BARE EQUIPMENT $2,802 $2,100 Not Implemented
UK1703 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,523 $55,849 Not Implemented
UK1703 # 02 Y:2017 02 2017 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $26,732 $110,000 Not Implemented
UK1703 # 03 Y:2017 03 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $99 $0 Not Implemented
UK1703 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $117 $0 Not Implemented
UK1703 # 05 Y:2017 05 2017 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $16,465 $1,000 Not Implemented
UK1703 # 06 Y:2017 06 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,466 $0 Not Implemented
UK1703 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,135 $0 Not Implemented
UK1703 # 08 Y:2017 08 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,384 $13,000 Not Implemented
UK1703 # 09 Y:2017 09 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,471 $1,968 Not Implemented
UK1703 # 10 Y:2017 10 2017 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $131 $0 Not Implemented
UK1703 # 11 Y:2017 11 2017 USE MINIMUM STEAM OPERATING PRESSURE $920 $0 Not Implemented
UK1703 # 12 Y:2017 12 2017 INSULATE BARE EQUIPMENT $720 $296 Not Implemented
UK1703 # 13 Y:2017 13 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $451 $1,150 Not Implemented
UK1610 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,688 $4,985 Implemented