IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,054

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1054 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $310 $0 Not Implemented
UD1054 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,248 $500 Implemented
UD1054 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $74 $0 Not Implemented
UD1054 # 11 Y:2023 11 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,768,755 $300,000 Not Implemented
UD1054 # 10 Y:2023 10 2023 OPTIMIZE PLANT POWER FACTOR $1,467 $7,400 Not Implemented
UD1054 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,823 $44,209 Implemented
UD1054 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $933 $7,594 Implemented
UD1054 # 07 Y:2023 07 2023 DISCONNECT BALLASTS $172 $240 Implemented
UD1041 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $26,031 $45,000 Not Implemented
UD1041 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $69,148 $18,523 Not Implemented
UD1041 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,702 $0 Not Implemented
UD1041 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,960 $604 Not Implemented
UD1041 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,327 $0 Not Implemented
UD1041 # 01 Y:2022 01 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,355 $0 Not Implemented
UD1039 # 07 Y:2022 07 2022 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,304 $2,369 Not Implemented
UD1039 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,654 $50 Not Implemented
UD1039 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $875 $316 Not Implemented
UD1039 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,423 $5,000 Not Implemented
UD1039 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $306 $202 Not Implemented
UD1039 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $1,123 $714 Not Implemented
UD1039 # 01 Y:2022 01 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $55 $0 Not Implemented
UD1036 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,141 $0 Not Implemented
UD1036 # 02 Y:2022 02 2022 COMBINE UTILITY METERS $309 $0 Not Implemented
UD1036 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,661 $250 Not Implemented
UD1036 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,150 $0 Not Implemented