Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
278
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0940 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,700 | $1,000 | Implemented |
OK0940 # 08 Y:2016 | 08 | 2016 | OPTIMIZE PLANT POWER FACTOR | $5,900 | $38,500 | Not Implemented |
OK0940 # 07 Y:2016 | 07 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,268 | $4,752 | Not Implemented |
OK0940 # 06 Y:2016 | 06 | 2016 | INSTALL SET-BACK TIMERS | $1,433 | $1,280 | Implemented |
OK0940 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,509 | $14,500 | Not Implemented |
OK0940 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,330 | $17,442 | Not Implemented |
OK0940 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,231 | $2,782 | Implemented |
OK0940 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,586 | $7,700 | Not Implemented |
OK0940 # 01 Y:2016 | 01 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,811 | $17,000 | Not Implemented |
OK0938 # 09 Y:2016 | 09 | 2016 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,693 | $3,236 | Implemented |
OK0938 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $34,651 | $40,660 | Not Implemented |
OK0938 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $45,405 | $59,664 | Implemented |
OK0938 # 03 Y:2016 | 03 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $16,558 | $4,930 | Not Implemented |
OK0938 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,124 | $3,000 | Not Implemented |
OK0938 # 05 Y:2016 | 05 | 2016 | INSTALL SET-BACK TIMERS | $317 | $344 | Implemented |
OK0938 # 06 Y:2016 | 06 | 2016 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $5,044 | $44,525 | Not Implemented |
OK0938 # 08 Y:2016 | 08 | 2016 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,294 | $5,000 | Not Implemented |
OK0938 # 10 Y:2016 | 10 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $372,611 | $70,000 | Not Implemented |
OK0938 # 11 Y:2016 | 11 | 2016 | OPTIMIZE PLANT POWER FACTOR | $26,300 | $47,542 | Implemented |
OK0938 # 12 Y:2016 | 12 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $308,836 | $1,371,615 | Not Implemented |
OK0938 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $4,491 | $2,935 | Not Implemented |
OK0930 # 02 Y:2015 | 02 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $17,351 | $10,800 | Not Implemented |
OK0930 # 01 Y:2015 | 01 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $137,102 | $90,000 | Not Implemented |
OK0930 # 03 Y:2015 | 03 | 2015 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,131 | $0 | Implemented |
OK0916 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,579 | $3,451 | Implemented |