IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

508

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0468 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $464 $2,021 Not Implemented
NC0468 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $867 $1,668 Not Implemented
NC0468 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $715 Not Implemented
NC0468 # 12 Y:2012 12 2012 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $34,749 $7,000 Implemented
NC0468 # 11 Y:2012 11 2012 INSTALL OCCUPANCY SENSORS $2,082 $2,100 Implemented
NC0468 # 10 Y:2012 10 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,293 $4,125 Not Implemented
NC0468 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,973 $2,136 Not Implemented
NC0468 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $128 $301 Not Implemented
IA0488 # 11 Y:2012 11 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,909 $743 Not Implemented
IA0488 # 10 Y:2012 10 2012 AIR CONDITION ONLY SPACE NECESSARY $1,073 $70 Not Implemented
IA0488 # 09 Y:2012 09 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,676 $7,150 Not Implemented
IA0488 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,279 $7,090 Not Implemented
IA0488 # 07 Y:2012 07 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,208 $554 Not Implemented
IA0488 # 06 Y:2012 06 2012 INSTALL OCCUPANCY SENSORS $3,689 $4,074 Not Implemented
IA0488 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $610 $550 Not Implemented
IA0488 # 04 Y:2012 04 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $709 $250 Not Implemented
IA0488 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,714 $800 Not Implemented
IA0488 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $758 $105 Not Implemented
IA0488 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,180 $550 Not Implemented
MZ0098 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,269 $850 Not Implemented
MZ0098 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,271 $1,283 Implemented
MZ0098 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $57,632 $23,700 Implemented
MZ0098 # 02 Y:2012 02 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,267 $26,000 Implemented
MZ0098 # 03 Y:2012 03 2012 USE RADIANT HEATER FOR SPOT HEATING $35,790 $36,000 Implemented
MZ0098 # 04 Y:2012 04 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,018 $250 Implemented