Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,714
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2501 # 09 Y:2025 | 09 | 2025 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $38,672 | $8,000 | n/a |
UL2501 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $95,468 | $929,060 | n/a |
UL2501 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $25,794 | $14,820 | n/a |
UL2501 # 06 Y:2025 | 06 | 2025 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $141,151 | $58,367 | n/a |
UL2501 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $1,240 | $2,661 | n/a |
UL2501 # 04 Y:2025 | 04 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $592 | $0 | n/a |
UL2501 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,347 | $574 | n/a |
UL2501 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,462 | $1,440 | n/a |
UL2501 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,472 | $0 | n/a |
WM0240 # 05 Y:2025 | 05 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,748 | $0 | n/a |
WM0240 # 04 Y:2025 | 04 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,825 | $0 | n/a |
WM0240 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,951 | $2,250 | n/a |
WM0240 # 02 Y:2025 | 02 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,119 | $3,235 | n/a |
WM0240 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $17,534 | $48,125 | n/a |
AS0604 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,160 | $515,135 | n/a |
AS0604 # 02 Y:2025 | 02 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $28,514 | $46,000 | n/a |
AS0604 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,851 | $2,568 | n/a |
AS0604 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $869 | $3,646 | n/a |
AS0604 # 05 Y:2025 | 05 | 2025 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $834 | $1,268 | n/a |
AS0604 # 06 Y:2025 | 06 | 2025 | INSTALL SPECTRAL REFLECTORS / DELAMP | $559 | $17 | n/a |
AS0604 # 07 Y:2025 | 07 | 2025 | INSTALL OCCUPANCY SENSORS | $215 | $315 | n/a |
SD0669 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $298,549 | $273,844 | n/a |
SD0669 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $20,905 | $894 | n/a |
SD0669 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,779 | $0 | n/a |
SD0669 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,099 | $2,437 | n/a |