IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0308 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,047 $1,210 Not Implemented
LE0504 # 01 Y:2021 01 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $205 $500 Implemented
LE0504 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,280 $4,000 Not Implemented
LE0504 # 03 Y:2021 03 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,847 $12,000 Implemented
LE0504 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,323 $12,000 Implemented
LE0504 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $61,283 $360,000 Implemented
CL2104 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,291 $14,832 Not Implemented
CL2104 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,151 $5,640 Not Implemented
CL2104 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $270 $250 Not Implemented
CL2104 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,440 $15,000 Not Implemented
CL2104 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,742 $2,100 Implemented
WM0162 # 01 Y:2021 01 2021 REPLACE BOILER $14,495 $38,512 Not Implemented
WM0162 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,315 $3,500 Not Implemented
WM0162 # 03 Y:2021 03 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,757 $2,560 Not Implemented
WM0162 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,639 $8,039 Not Implemented
WM0162 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $1,584 $2,625 Not Implemented
WM0162 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,380 $2,300 Not Implemented
WM0162 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,298 $4,575 Not Implemented
MZ0305 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,825 $9,000 Implemented
MZ0305 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,692 $44,928 Implemented
MZ0305 # 03 Y:2021 03 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,350 $93,000 Implemented
MZ0305 # 04 Y:2021 04 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $579 $320 Implemented
MZ0305 # 05 Y:2021 05 2021 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $16,340 $5,200 Implemented
MZ0305 # 06 Y:2021 06 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,689 $240 Implemented
MZ0303 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,170 $360 Implemented