Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0308 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,047 | $1,210 | Not Implemented |
LE0504 # 01 Y:2021 | 01 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $205 | $500 | Implemented |
LE0504 # 02 Y:2021 | 02 | 2021 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,280 | $4,000 | Not Implemented |
LE0504 # 03 Y:2021 | 03 | 2021 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,847 | $12,000 | Implemented |
LE0504 # 04 Y:2021 | 04 | 2021 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,323 | $12,000 | Implemented |
LE0504 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $61,283 | $360,000 | Implemented |
CL2104 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,291 | $14,832 | Not Implemented |
CL2104 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,151 | $5,640 | Not Implemented |
CL2104 # 03 Y:2021 | 03 | 2021 | INSULATE BARE EQUIPMENT | $270 | $250 | Not Implemented |
CL2104 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,440 | $15,000 | Not Implemented |
CL2104 # 05 Y:2021 | 05 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,742 | $2,100 | Implemented |
WM0162 # 01 Y:2021 | 01 | 2021 | REPLACE BOILER | $14,495 | $38,512 | Not Implemented |
WM0162 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,315 | $3,500 | Not Implemented |
WM0162 # 03 Y:2021 | 03 | 2021 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,757 | $2,560 | Not Implemented |
WM0162 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,639 | $8,039 | Not Implemented |
WM0162 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $1,584 | $2,625 | Not Implemented |
WM0162 # 06 Y:2021 | 06 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,380 | $2,300 | Not Implemented |
WM0162 # 07 Y:2021 | 07 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,298 | $4,575 | Not Implemented |
MZ0305 # 01 Y:2021 | 01 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,825 | $9,000 | Implemented |
MZ0305 # 02 Y:2021 | 02 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,692 | $44,928 | Implemented |
MZ0305 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $27,350 | $93,000 | Implemented |
MZ0305 # 04 Y:2021 | 04 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $579 | $320 | Implemented |
MZ0305 # 05 Y:2021 | 05 | 2021 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $16,340 | $5,200 | Implemented |
MZ0305 # 06 Y:2021 | 06 | 2021 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,689 | $240 | Implemented |
MZ0303 # 01 Y:2021 | 01 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,170 | $360 | Implemented |