IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,415

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2014 # 03 Y:2020 03 2020 REPLACE TREATED WATER WITH WELL / SURFACE WATER $922 $862 Not Implemented
MZ0302 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $217 $45 Implemented
MZ0302 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,817 $55,992 Implemented
MZ0302 # 06 Y:2020 06 2020 INSTALL OCCUPANCY SENSORS $2,138 $1,800 Not Implemented
MZ0302 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,015 $4,700 Implemented
MZ0302 # 02 Y:2020 02 2020 RECOVER WASTE HEAT FROM EQUIPMENT $19,767 $14,500 Not Implemented
MZ0302 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $251 $226 Not Implemented
AM0813 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $9,070 $14,280 Not Implemented
AM0813 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,260 $2,000 Implemented
AM0813 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $6,880 Implemented
AM0813 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,380 $13 Implemented
AM0813 # 05 Y:2020 05 2020 PAY UTILITY BILLS ON TIME $1,735 $0 Implemented
AM0813 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $980 $1,040 Implemented
NL0053 # 01 Y:2020 01 2020 UTILIZE A LESS EXPENSIVE COOLING METHOD $46,240 $187,000 Not Implemented
NL0053 # 02 Y:2020 02 2020 KEEP EQUIPMENT CLEAN $24,724 $8,528 Implemented
NL0053 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,267 $4,456 Implemented
NL0053 # 04 Y:2020 04 2020 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,704 $12,000 Implemented
NL0053 # 05 Y:2020 05 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,360 $56 Implemented
NL0053 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,013 $1,500 Implemented
NL0053 # 07 Y:2020 07 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,612 $1,245 Not Implemented
NL0053 # 08 Y:2020 08 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,080 $56 Implemented
NL0053 # 09 Y:2020 09 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $643 $1,643 Not Implemented
NL0053 # 10 Y:2020 10 2020 RECOVER AND REUSE WASTE MATERIAL $637 $630 Not Implemented
CL2013 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,650 $33,470 Implemented
CL2013 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,416 $4,336 Implemented