Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,415
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0814 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,694 | $12,100 | Implemented |
MA0814 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,857 | $4,096 | Implemented |
IC0233 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $329 | $167 | Not Implemented |
IC0233 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,040 | $167 | Not Implemented |
IC0233 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,788 | $861 | Not Implemented |
IC0233 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,778 | $2,589 | Not Implemented |
WV0589 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,897 | $154,350 | Not Implemented |
WV0589 # 02 Y:2020 | 02 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $22,091 | $28,000 | Implemented |
WV0589 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $19,827 | $15,605 | Implemented |
WV0589 # 04 Y:2020 | 04 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,254 | $12,580 | Not Implemented |
WV0589 # 05 Y:2020 | 05 | 2020 | OPTIMIZE PLANT POWER FACTOR | $10,950 | $36,000 | Implemented |
WV0589 # 06 Y:2020 | 06 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $10,700 | $5,225 | Implemented |
WV0589 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,413 | $2,438 | Implemented |
WV0589 # 08 Y:2020 | 08 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $2,587 | $575 | Implemented |
WV0589 # 09 Y:2020 | 09 | 2020 | MINIMIZE WATER USAGE | $2,004 | $3,500 | Not Implemented |
WV0589 # 10 Y:2020 | 10 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,730 | $1,251 | Implemented |
WV0589 # 11 Y:2020 | 11 | 2020 | INSULATE BARE EQUIPMENT | $1,270 | $427 | Implemented |
WV0589 # 12 Y:2020 | 12 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,181 | $75 | Implemented |
WV0589 # 13 Y:2020 | 13 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $777 | $2,500 | Not Implemented |
TT0235 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,019 | $180,485 | Not Implemented |
TT0235 # 02 Y:2020 | 02 | 2020 | APPLY FOR INVESTMENT INCENTIVES | $51,142 | $11,500 | Not Implemented |
TT0235 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $24,204 | $32,000 | Not Implemented |
TT0235 # 04 Y:2020 | 04 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,885 | $12,000 | Not Implemented |
TT0235 # 05 Y:2020 | 05 | 2020 | APPLY FOR INVESTMENT INCENTIVES | $4,581 | $120 | Not Implemented |
TT0235 # 06 Y:2020 | 06 | 2020 | INSULATE BARE EQUIPMENT | $3,534 | $9,920 | Not Implemented |