IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

278

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0855 # 18 Y:2013 18 2013 INSULATE BARE EQUIPMENT $258 $960 Not Implemented
OK0855 # 19 Y:2013 19 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,292 $6,796 Not Implemented
OK0855 # 20 Y:2013 20 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,823 $3,063 Not Implemented
OK0855 # 21 Y:2013 21 2013 OPTIMIZE PLANT POWER FACTOR $17,798 $13,508 Implemented
OK0806 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $109,231 $57,500 Not Implemented
OK0806 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,484 $37,707 Implemented
OK0806 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,177 $38,005 Implemented
OK0806 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,415 $7,724 Implemented
OK0806 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,172 $1,600 Implemented
OK0806 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,602 $414 Implemented
OK0806 # 07 Y:2011 07 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $8,222 $870 Not Implemented
OK0806 # 08 Y:2011 08 2011 INSULATE BARE EQUIPMENT $6,859 $2,964 Not Implemented
OK0806 # 09 Y:2011 09 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,676 $7,130 Not Implemented
OK0777 # 01 Y:2009 01 2009 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $164,328 $490,000 Implemented
OK0777 # 02 Y:2009 02 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $26,234 $0 Implemented
OK0777 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,889 $19,448 Not Implemented
OK0777 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,136 $3,129 Implemented
OK0777 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $28,753 $33,300 Implemented
OK0777 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $2,638 $779 Implemented
OK0764 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,109 $5,086 Not Implemented
OK0764 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,596 $14,878 Not Implemented
OK0764 # 03 Y:2008 03 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $477 $1,165 Not Implemented
OK0764 # 04 Y:2008 04 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $22,038 $14,300 Not Implemented
OK0764 # 05 Y:2008 05 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $7,000 $0 Not Implemented
OK0764 # 06 Y:2008 06 2008 CLOSE OFF UNNEEDED STEAM LINES $7,161 $0 Not Implemented