IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

410

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2415 # 02 Y:2024 02 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $72,820 $0 n/a
UL2415 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,401 $2,438 n/a
UL2415 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $104,863 $758,879 n/a
UL2415 # 03 Y:2024 03 2024 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $62,771 $58,367 n/a
UL2415 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,257 $2,700 n/a
UL2415 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $28,874 $11,700 n/a
IP0197 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,370 $13,000 n/a
IP0197 # 01 Y:2024 01 2024 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $33,478 $697 n/a
IP0197 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,000 $1,506 n/a
IP0197 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,867 $18,107 n/a
IP0197 # 02 Y:2024 02 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,662 $320 n/a
IP0196 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,327 $2,497 n/a
IP0196 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,126 $42 n/a
IP0196 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,499 $2,975 n/a
IP0196 # 04 Y:2024 04 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $563 $520 n/a
IP0196 # 02 Y:2024 02 2024 MODIFY STARTUP/SHUTDOWN TIMES $1,880 $40 n/a
IP0196 # 01 Y:2024 01 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $507 $0 n/a
IP0189 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,450 $33 Implemented
IP0189 # 05 Y:2024 05 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $43,723 $84,496 Implemented
IP0189 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $1,248 $716 Implemented
IP0189 # 02 Y:2024 02 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,822 $0 Implemented
IP0189 # 03 Y:2024 03 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,852 $325 Implemented
IC0298 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $3,568 $280 n/a
IC0298 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $216,800 $1,202,971 n/a
IC0298 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,839 $0 n/a