Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
426
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0209 # 03 Y:2025 | 03 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $910 | $0 | n/a |
IP0209 # 04 Y:2025 | 04 | 2025 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $336 | $0 | n/a |
IP0209 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $11,808 | $0 | n/a |
IP0209 # 07 Y:2025 | 07 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,200 | $1,306 | n/a |
IP0209 # 02 Y:2025 | 02 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $4,072 | $0 | n/a |
IP0209 # 06 Y:2025 | 06 | 2025 | INSTALL AUTOMATIC STACK DAMPER | $9,546 | $1,395 | n/a |
IP0209 # 05 Y:2025 | 05 | 2025 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $9,829 | $238 | n/a |
IP0208 # 05 Y:2025 | 05 | 2025 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,484 | $373 | n/a |
IP0208 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,420 | $50 | n/a |
IP0208 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,254 | $8,190 | n/a |
IP0208 # 09 Y:2025 | 09 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $940 | $1,742 | n/a |
IP0208 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $705 | $200 | n/a |
IP0208 # 08 Y:2025 | 08 | 2025 | OPTIMIZE PLANT POWER FACTOR | $23,307 | $34,470 | n/a |
IP0208 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,572 | $0 | n/a |
IP0208 # 04 Y:2025 | 04 | 2025 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,666 | $82 | n/a |
IP0208 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $524 | $0 | n/a |
UL2415 # 03 Y:2024 | 03 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $62,771 | $58,367 | n/a |
UL2415 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,257 | $2,700 | n/a |
UL2415 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,401 | $2,438 | n/a |
UL2415 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $104,863 | $758,879 | n/a |
UL2415 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $28,874 | $11,700 | n/a |
UL2415 # 02 Y:2024 | 02 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $72,820 | $0 | n/a |
IP0197 # 02 Y:2024 | 02 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,662 | $320 | Not Implemented |
IP0197 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,867 | $18,107 | Implemented |
IP0197 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $1,000 | $1,506 | Implemented |