Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
122
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1077 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,559 | $9,108 | Not Implemented |
OK1077 # 04 Y:2022 | 04 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,586 | $7,371 | Not Implemented |
OK1077 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $530 | $347 | Implemented |
OK1077 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,215 | $230,880 | Not Implemented |
OK1077 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,255 | $7,590 | Not Implemented |
MZ0308 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,047 | $1,210 | Not Implemented |
MZ0308 # 02 Y:2021 | 02 | 2021 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,647 | $5,300 | Not Implemented |
MZ0308 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,438 | $24,586 | Not Implemented |
MZ0278 # 02 Y:2019 | 02 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $382,507 | $601,250 | Implemented |
MZ0278 # 10 Y:2019 | 10 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,709 | $200 | Implemented |
MZ0278 # 09 Y:2019 | 09 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,558 | $870 | Implemented |
MZ0278 # 08 Y:2019 | 08 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,571 | $11,900 | Not Implemented |
MZ0278 # 07 Y:2019 | 07 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $42,284 | $13,051 | Implemented |
MZ0278 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $45,917 | $2,907 | Implemented |
MZ0278 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $53,880 | $7,750 | Not Implemented |
MZ0278 # 04 Y:2019 | 04 | 2019 | REDUCE SCRAP PRODUCTION | $126,263 | $207,500 | Implemented |
MZ0278 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $902,475 | $6,762,500 | Implemented |
MZ0278 # 03 Y:2019 | 03 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $176,232 | $3,250 | Implemented |
MZ0247 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,430 | $4,900 | Implemented |
MZ0247 # 05 Y:2018 | 05 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,573 | $500 | Not Implemented |
MZ0247 # 07 Y:2018 | 07 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,794 | $740 | Not Implemented |
MZ0247 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,053 | $170 | Not Implemented |
MZ0247 # 01 Y:2018 | 01 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $29,241 | $3,340 | Not Implemented |
MZ0247 # 02 Y:2018 | 02 | 2018 | OPTIMIZE PLANT POWER FACTOR | $13,764 | $10,000 | Not Implemented |
MZ0247 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $6,231 | $2,346 | Implemented |