Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
150
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2409 # 02 Y:2024 | 02 | 2024 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $8,858 | $43,234 | n/a |
UL2409 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,680 | $5,800 | n/a |
UL2409 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,092 | $975 | n/a |
UL2409 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $52,606 | $886,307 | n/a |
UL2409 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,073 | $2,880 | n/a |
TT0312 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $9,940 | $2,262 | n/a |
TT0312 # 10 Y:2024 | 10 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,155 | $4,810 | n/a |
TT0312 # 09 Y:2024 | 09 | 2024 | INSTALL OCCUPANCY SENSORS | $1,294 | $1,860 | n/a |
TT0312 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,253 | $3,000 | n/a |
TT0312 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,740 | $11,250 | n/a |
TT0312 # 06 Y:2024 | 06 | 2024 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $14,000 | $12,000 | n/a |
TT0312 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,292 | $635 | n/a |
TT0312 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $30,815 | $6,360 | n/a |
TT0312 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,728 | $30 | n/a |
TT0312 # 01 Y:2024 | 01 | 2024 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $36,945 | $0 | n/a |
UL2318 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $1,925 | $6,408 | n/a |
UL2318 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,544 | $12,786 | n/a |
UL2318 # 04 Y:2023 | 04 | 2023 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,046 | $0 | n/a |
UL2318 # 01 Y:2023 | 01 | 2023 | OPTIMIZE PLANT POWER FACTOR | $14,952 | $10,400 | n/a |
UL2318 # 05 Y:2023 | 05 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,113 | $0 | n/a |
UL2318 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,695 | $2,160 | n/a |
UL2318 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $59,688 | $501,748 | n/a |
UL2306 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $103,804 | $14,859 | Not Implemented |
UL2306 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $30,055 | $314,019 | Not Implemented |
UL2306 # 03 Y:2023 | 03 | 2023 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,595 | $12,891 | Not Implemented |