IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

109

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0113 # 06 Y:2025 06 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,978 $3,292 n/a
NL0113 # 07 Y:2025 07 2025 INSTALL OCCUPANCY SENSORS $2,902 $772 n/a
NL0113 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN WATER LINES AND VALVES $58,063 $520 n/a
NL0113 # 01 Y:2025 01 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,107,096 $3,374,250 n/a
NL0113 # 02 Y:2025 02 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $542,223 $1,261,250 n/a
NL0113 # 05 Y:2025 05 2025 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,520 $400 n/a
NL0113 # 08 Y:2025 08 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $374 $500 n/a
NL0113 # 04 Y:2025 04 2025 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $43,590 $52,034 n/a
NL0078 # 01 Y:2023 01 2023 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $31,345 $100,000 Implemented
NL0078 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $658 $80 Implemented
NL0078 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $812 $2,080 Implemented
NL0078 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $6,550 $20,000 Not Implemented
NL0078 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,587 $2,300 Implemented
NL0078 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,358 $17,280 Implemented
NL0078 # 08 Y:2023 08 2023 METER WASTE WATER $128 $250 Implemented
NL0078 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $415 Implemented
NL0057 # 02 Y:2021 02 2021 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $20,793 $13,100 Not Implemented
NL0057 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,211 $2,500 Implemented
NL0057 # 05 Y:2021 05 2021 USE RADIANT HEATER FOR SPOT HEATING $4,782 $15,170 Implemented
NL0057 # 03 Y:2021 03 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,271 $16,980 Not Implemented
NL0057 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,696 $154,720 Not Implemented
NL0057 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,345 $11,175 Implemented
NL0048 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,955 $4,000 Implemented
NL0048 # 05 Y:2020 05 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,824 $50 Implemented
NL0048 # 06 Y:2020 06 2020 RECOVER AND REUSE WASTE MATERIAL $664 $3,180 Not Implemented