Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0771 # 02 Y:2023 | 02 | 2023 | REDUCE OR ELIMINATE WASTE | $56,000 | $850 | Not Implemented |
OR0771 # 01 Y:2023 | 01 | 2023 | IMPROVE LUBRICATION PRACTICES | $13,223 | $0 | Not Implemented |
OR0771 # 03 Y:2023 | 03 | 2023 | LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD | $30,696 | $13,620 | Not Implemented |
OR0771 # 05 Y:2023 | 05 | 2023 | FILTER AND REUSE HYDRAULIC OIL | $21,755 | $80,000 | Not Implemented |
OR0771 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,338 | $7,581 | Not Implemented |
OR0736 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,946 | $3,000 | Implemented |
OR0736 # 05 Y:2020 | 05 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $17,948 | $212,663 | Not Implemented |
OR0736 # 01 Y:2020 | 01 | 2020 | USE SYNTHETIC LUBRICANT | $17,895 | $672 | Not Implemented |
OR0736 # 04 Y:2020 | 04 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $922 | $114 | Implemented |
OR0736 # 03 Y:2020 | 03 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,008 | $1,549 | Implemented |
OR0600 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,704 | $500 | Implemented |
OR0600 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,835 | $2,724 | Implemented |
OR0600 # 07 Y:2012 | 07 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,399 | $560 | Implemented |
OR0600 # 06 Y:2012 | 06 | 2012 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $6,653 | $385 | Implemented |
OR0600 # 05 Y:2012 | 05 | 2012 | INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES | $4,720 | $0 | Not Implemented |
OR0600 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $940 | $392 | Implemented |
OR0600 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $334 | $0 | Implemented |
OR0600 # 01 Y:2012 | 01 | 2012 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $14,559 | $2,500 | Not Implemented |
OR0585 # 02 Y:2012 | 02 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,690 | $2,000 | Not Implemented |
OR0585 # 01 Y:2012 | 01 | 2012 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,836 | $7,417 | Not Implemented |
OR0585 # 10 Y:2012 | 10 | 2012 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $8,580 | $0 | Not Implemented |
OR0585 # 09 Y:2012 | 09 | 2012 | USE SOLAR HEAT TO MAKE ELECTRICTY | $7,083 | $47,838 | Not Implemented |
OR0585 # 08 Y:2012 | 08 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $16,379 | $16,379 | Not Implemented |
OR0585 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $13,449 | $24,282 | Not Implemented |
OR0585 # 06 Y:2012 | 06 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,942 | $1,000 | Not Implemented |