IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

390

matching recommendations
Reset
NAICS 326 Plastics and Rubber Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0813 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,974 $1,250 Implemented
GT0813 # 05 Y:2005 05 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,836 $0 Not Implemented
GT0813 # 01 Y:2005 01 2005 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,381 $0 Implemented
GT0813 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,360 $8,000 Not Implemented
GT0813 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,865 $3,500 Not Implemented
GT0813 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,172 $565 Not Implemented
GT0813 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $22,247 $0 Implemented
GT0813 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,158 $41,528 Implemented
WI0501 # 04 Y:2005 04 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,873 $0 Not Implemented
WI0501 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,905 $0 Not Implemented
WI0501 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,224 $19,800 Not Implemented
WI0501 # 02 Y:2005 02 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,037 $30,800 Not Implemented
WI0501 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,008 $0 Not Implemented
WI0501 # 06 Y:2005 06 2005 USE SYNTHETIC LUBRICANT $921 $800 Not Implemented
LE0222 # 09 Y:2005 09 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,823 $500 Not Implemented
LE0222 # 07 Y:2005 07 2005 RECOVER WASTE HEAT FROM EQUIPMENT $1,714 $7,800 Not Implemented
TA0104 # 03 Y:2005 03 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,020 $1,880 Not Implemented
TA0104 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,785 $1,444 Implemented
LE0222 # 08 Y:2005 08 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $513 $480 Not Implemented
LE0222 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,752 $200 Not Implemented
TA0104 # 02 Y:2005 02 2005 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $22,990 $0 Implemented
TA0104 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $6,461 $244 Implemented
LE0222 # 03 Y:2005 03 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $5,760 $5,100 Not Implemented
LE0222 # 02 Y:2005 02 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,410 $49,000 Not Implemented
LE0222 # 01 Y:2005 01 2005 ADD ADDITIONAL PRODUCTION SHIFT $96,000 $5,000 Not Implemented