Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
390
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0813 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,974 | $1,250 | Implemented |
GT0813 # 05 Y:2005 | 05 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $4,836 | $0 | Not Implemented |
GT0813 # 01 Y:2005 | 01 | 2005 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,381 | $0 | Implemented |
GT0813 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,360 | $8,000 | Not Implemented |
GT0813 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,865 | $3,500 | Not Implemented |
GT0813 # 03 Y:2005 | 03 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,172 | $565 | Not Implemented |
GT0813 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $22,247 | $0 | Implemented |
GT0813 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,158 | $41,528 | Implemented |
WI0501 # 04 Y:2005 | 04 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,873 | $0 | Not Implemented |
WI0501 # 03 Y:2005 | 03 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,905 | $0 | Not Implemented |
WI0501 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,224 | $19,800 | Not Implemented |
WI0501 # 02 Y:2005 | 02 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $16,037 | $30,800 | Not Implemented |
WI0501 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,008 | $0 | Not Implemented |
WI0501 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $921 | $800 | Not Implemented |
LE0222 # 09 Y:2005 | 09 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,823 | $500 | Not Implemented |
LE0222 # 07 Y:2005 | 07 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,714 | $7,800 | Not Implemented |
TA0104 # 03 Y:2005 | 03 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,020 | $1,880 | Not Implemented |
TA0104 # 05 Y:2005 | 05 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,785 | $1,444 | Implemented |
LE0222 # 08 Y:2005 | 08 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $513 | $480 | Not Implemented |
LE0222 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,752 | $200 | Not Implemented |
TA0104 # 02 Y:2005 | 02 | 2005 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $22,990 | $0 | Implemented |
TA0104 # 06 Y:2005 | 06 | 2005 | INSTALL OCCUPANCY SENSORS | $6,461 | $244 | Implemented |
LE0222 # 03 Y:2005 | 03 | 2005 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $5,760 | $5,100 | Not Implemented |
LE0222 # 02 Y:2005 | 02 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $13,410 | $49,000 | Not Implemented |
LE0222 # 01 Y:2005 | 01 | 2005 | ADD ADDITIONAL PRODUCTION SHIFT | $96,000 | $5,000 | Not Implemented |