Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
337
matching recommendationsNAICS | 326 | Plastics and Rubber Products Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0653 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,900 | $31,760 | Not Implemented |
CO0653 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,630 | $800 | Implemented |
CO0653 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,230 | $91,620 | Not Implemented |
CO0653 # 04 Y:2011 | 04 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,380 | $25,810 | Not Implemented |
WV0439 # 09 Y:2011 | 09 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,194 | $468 | Implemented |
WV0439 # 08 Y:2011 | 08 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,735 | $96 | Implemented |
WV0439 # 03 Y:2011 | 03 | 2011 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $47,442 | $26,920 | Not Implemented |
WV0439 # 14 Y:2011 | 14 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,083 | $3,000 | Implemented |
WV0439 # 11 Y:2011 | 11 | 2011 | INSULATE BARE EQUIPMENT | $4,234 | $972 | Implemented |
WV0439 # 10 Y:2011 | 10 | 2011 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,477 | $144 | Implemented |
WV0439 # 16 Y:2011 | 16 | 2011 | INSTALL OCCUPANCY SENSORS | $298 | $518 | Not Implemented |
WV0439 # 15 Y:2011 | 15 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $631 | $1,000 | Implemented |
WV0439 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $67,687 | $83,338 | Not Implemented |
WV0439 # 12 Y:2011 | 12 | 2011 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,745 | $7,360 | Not Implemented |
WV0439 # 05 Y:2011 | 05 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $22,385 | $30,600 | Not Implemented |
WV0439 # 02 Y:2011 | 02 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $48,688 | $48,160 | Not Implemented |
WV0439 # 13 Y:2011 | 13 | 2011 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,536 | $9,580 | Not Implemented |
WV0439 # 04 Y:2011 | 04 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $23,664 | $1,202 | Implemented |
WV0439 # 06 Y:2011 | 06 | 2011 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $20,648 | $4,000 | Implemented |
WV0439 # 07 Y:2011 | 07 | 2011 | IMPROVE LUBRICATION PRACTICES | $12,205 | $8,311 | Not Implemented |
UD0844 # 13 Y:2011 | 13 | 2011 | USE OPTIMUM TEMPERATURE | $3,225 | $0 | Not Implemented |
UD0844 # 06 Y:2011 | 06 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $20,051 | $18,555 | Not Implemented |
UD0844 # 09 Y:2011 | 09 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,616 | $500 | Not Implemented |
UD0844 # 10 Y:2011 | 10 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $267 | $0 | Implemented |
UD0844 # 05 Y:2011 | 05 | 2011 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,557 | $0 | Implemented |