Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,791
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0315 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,328 | $1,500 | n/a |
TT0315 # 01 Y:2024 | 01 | 2024 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $44,634 | $22,300 | n/a |
TT0315 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,159 | $1,700 | n/a |
TT0315 # 09 Y:2024 | 09 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $204 | $184 | n/a |
TT0315 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,067 | $20,480 | n/a |
TT0315 # 04 Y:2024 | 04 | 2024 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $10,616 | $66,000 | n/a |
TT0315 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,389 | $2,000 | n/a |
TT0315 # 02 Y:2024 | 02 | 2024 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $13,017 | $16,000 | n/a |
TT0315 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,015 | $15,600 | n/a |
WV0658 # 04 Y:2024 | 04 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,305 | $1,500 | n/a |
UF0611 # 08 Y:2024 | 08 | 2024 | INSTALL TURBULATORS | $2,454 | $3,750 | n/a |
UF0611 # 03 Y:2024 | 03 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $30,134 | $5,900 | n/a |
UF0611 # 04 Y:2024 | 04 | 2024 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $26,100 | $0 | n/a |
UF0611 # 06 Y:2024 | 06 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,901 | $7,320 | n/a |
UF0611 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $36,892 | $25,400 | n/a |
WV0658 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $12,543 | $934 | n/a |
WV0658 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,234 | $90,000 | n/a |
WV0658 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,787 | $900 | n/a |
WV0658 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,056 | $7,004 | n/a |
WV0658 # 05 Y:2024 | 05 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $10,700 | $3,650 | n/a |
WV0658 # 01 Y:2024 | 01 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $46,042 | $4,000 | n/a |
WV0658 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,674 | $10,167 | n/a |
WV0658 # 09 Y:2024 | 09 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,325 | $952 | n/a |
UF0611 # 01 Y:2024 | 01 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $99,213 | $111,120 | n/a |
UF0611 # 05 Y:2024 | 05 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $19,576 | $19,104 | n/a |