IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,005

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0724 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $126 $210 Implemented
MI0306 # 03 Y:2017 03 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,316 $240 Implemented
MI0306 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,134 $1,660 Implemented
MI0306 # 09 Y:2017 09 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,238 $650 Implemented
MI0306 # 10 Y:2017 10 2017 INSTALL OCCUPANCY SENSORS $1,858 $177 Implemented
MI0306 # 11 Y:2017 11 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $711 $120 Implemented
MI0306 # 12 Y:2017 12 2017 INSTALL OCCUPANCY SENSORS $612 $1,630 Implemented
NC0584 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $885 $200 Implemented
SU0427 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $442 $317 Implemented
SU0427 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,703 $34,086 Implemented
SU0427 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $124 $556 Implemented
SU0427 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $189 $924 Implemented
MA0765 # 02 Y:2016 02 2016 OPTIMIZE PLANT POWER FACTOR $15,004 $12,000 Implemented
MA0765 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,000 $1,000 Implemented
MA0765 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $1,576 $1,152 Implemented
MA0765 # 06 Y:2016 06 2016 REDUCE VENTILATION AIR $1,080 $900 Implemented
BD0490 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,902 $3,069 Implemented
BD0490 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $630 $800 Implemented
OR0673 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,117 $5,344 Implemented
OR0673 # 05 Y:2016 05 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,464 $0 Implemented
UD0953 # 07 Y:2016 07 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $634 $0 Implemented
WV0530 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $45,649 $8,838 Implemented
WV0530 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,558 $72,000 Implemented
WV0530 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,714 $16,453 Implemented
WV0530 # 04 Y:2016 04 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $15,987 $1,000 Implemented