IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,003

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0816 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,929 $0 Implemented
UD0816 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,108 $0 Implemented
UD0816 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $22,144 $0 Implemented
UD0816 # 09 Y:2010 09 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $15,412 $0 Implemented
UD0816 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,426 $0 Implemented
UD0816 # 12 Y:2010 12 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,512 $0 Implemented
MA0659 # 01 Y:2010 01 2010 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $35,538 $103,290 Implemented
MA0659 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,141 $119,100 Implemented
MA0659 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,273 $1,800 Implemented
SD0426 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,373 $100 Implemented
SD0426 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,943 $1,000 Implemented
SD0426 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,485 $54,987 Implemented
LE0296 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,665 $1,768 Implemented
LE0296 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $878 $2,338 Implemented
LE0296 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $418 $182 Implemented
UD0814 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,324 $60,476 Implemented
UD0814 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,387 $28,012 Implemented
UD0814 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $899 $1,724 Implemented
UD0814 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $386 $0 Implemented
UD0814 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,642 $1,000 Implemented
UD0814 # 09 Y:2010 09 2010 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $8,568 $3,000 Implemented
UD0814 # 10 Y:2010 10 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,017 $400 Implemented
UD0814 # 12 Y:2010 12 2010 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $3,484 $0 Implemented
AM0570 # 01 Y:2010 01 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,640 $200 Implemented
AM0570 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,210 $12,750 Implemented