IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0575 # 12 Y:2021 12 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,554 $6,764 Implemented
SF0575 # 11 Y:2021 11 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,353 $19,986 Implemented
SF0575 # 10 Y:2021 10 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,624 $18,284 Implemented
SF0575 # 09 Y:2021 09 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,137 $1,513 Implemented
SF0575 # 08 Y:2021 08 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,559 $16,052 Implemented
SF0575 # 07 Y:2021 07 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,748 $1,047 Implemented
SF0575 # 06 Y:2021 06 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,311 $966 Implemented
SF0575 # 05 Y:2021 05 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,642 $1,513 Implemented
SF0575 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,084 $0 Implemented
AS0382 # 09 Y:2004 09 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $128,880 $850 Implemented
AS0382 # 12 Y:2004 12 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,219 $1,125 Implemented
AS0382 # 11 Y:2004 11 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $4,650 $36,448 Implemented
AS0382 # 10 Y:2004 10 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,540 $3,735 Implemented
AS0382 # 08 Y:2004 08 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $6,306 $300 Implemented
AS0382 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $17,174 $840 Implemented
AS0382 # 06 Y:2004 06 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $516 $1,697 Implemented
AS0382 # 05 Y:2004 05 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,254 $4,200 Implemented
AS0382 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $736 $128,880 Implemented
AS0382 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $743 $6,446 Implemented
AS0382 # 02 Y:2004 02 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,403 $240 Implemented
AS0382 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,391 $50 Implemented
AS0352 # 02 Y:2003 02 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $402 $1,000 Implemented
AS0352 # 07 Y:2003 07 2003 CLEAR AND RENT EXISTING SPACE $12,132 $9,260 Implemented
AS0352 # 06 Y:2003 06 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $29,631 $1,380 Implemented
AS0352 # 05 Y:2003 05 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $194 $0 Implemented