Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
185
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0241 # 03 Y:2017 | 03 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,547 | $4,050 | Implemented |
MZ0241 # 10 Y:2017 | 10 | 2017 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $93,474 | $93,474 | Implemented |
MZ0241 # 04 Y:2017 | 04 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,218 | $1,820 | Implemented |
MZ0241 # 01 Y:2017 | 01 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $326 | $0 | Implemented |
MZ0241 # 02 Y:2017 | 02 | 2017 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $1,238 | $3,570 | Implemented |
MZ0241 # 05 Y:2017 | 05 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,321 | $100,150 | Implemented |
MZ0241 # 07 Y:2017 | 07 | 2017 | INSTALL OCCUPANCY SENSORS | $658 | $700 | Implemented |
MZ0241 # 06 Y:2017 | 06 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,151 | $4,125 | Implemented |
GT0909 # 05 Y:2017 | 05 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $49,838 | $321,120 | Implemented |
GT0909 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,255 | $36,180 | Implemented |
NL0014 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,100 | $0 | Implemented |
NL0014 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,430 | $12,500 | Implemented |
NL0014 # 01 Y:2017 | 01 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $9,200 | $1,630 | Implemented |
NL0014 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,804 | $2,500 | Implemented |
LE0444 # 06 Y:2017 | 06 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,762 | $46,000 | Implemented |
LE0444 # 11 Y:2017 | 11 | 2017 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $233,480 | $1,905,000 | Implemented |
LE0444 # 05 Y:2017 | 05 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $110,990 | $170,000 | Implemented |
LE0444 # 02 Y:2017 | 02 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $917 | $30 | Implemented |
LE0444 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $31,107 | $30 | Implemented |
LE0444 # 10 Y:2017 | 10 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,541 | $6,960 | Implemented |
LE0444 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,628 | $5,580 | Implemented |
MI0323 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,380 | $1,660 | Implemented |
MI0323 # 06 Y:2017 | 06 | 2017 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,290 | $7,150 | Implemented |
MI0323 # 01 Y:2017 | 01 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $19,478 | $51,292 | Implemented |
MI0323 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,856 | $2,800 | Implemented |