Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0583 # 07 Y:2024 | 07 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $94 | $52 | n/a |
AS0583 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,282 | $4,696 | n/a |
AS0583 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $122 | $476 | n/a |
AS0583 # 03 Y:2024 | 03 | 2024 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $4,022 | $1,805 | n/a |
AS0583 # 02 Y:2024 | 02 | 2024 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $43,888 | $15,124 | n/a |
AS0583 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $137 | $172 | n/a |
AS0583 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $87,396 | $642,159 | n/a |
SF0575 # 03 Y:2021 | 03 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,526 | $0 | Not Implemented |
SF0575 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,559 | $16,052 | Implemented |
SF0575 # 10 Y:2021 | 10 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,624 | $18,284 | Implemented |
SF0575 # 05 Y:2021 | 05 | 2021 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,642 | $1,513 | Implemented |
SF0575 # 07 Y:2021 | 07 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,748 | $1,047 | Implemented |
SF0575 # 12 Y:2021 | 12 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,554 | $6,764 | Implemented |
SF0575 # 11 Y:2021 | 11 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,353 | $19,986 | Implemented |
SF0575 # 09 Y:2021 | 09 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,137 | $1,513 | Implemented |
SF0575 # 06 Y:2021 | 06 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,311 | $966 | Implemented |
SF0575 # 02 Y:2021 | 02 | 2021 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $5,510 | $0 | Not Implemented |
SF0575 # 04 Y:2021 | 04 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,084 | $0 | Implemented |
SF0575 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,492 | $100 | Not Implemented |
AS0419 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,620 | $1,000 | Not Implemented |
AS0419 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,482 | $7,500 | Not Implemented |
AS0419 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,171 | $5,000 | Not Implemented |
AS0382 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $516 | $1,697 | Implemented |
AS0382 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $17,174 | $840 | Implemented |
AS0382 # 08 Y:2004 | 08 | 2004 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $6,306 | $300 | Implemented |