IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

63

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0222 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,772 $46,800 Implemented
UU0222 # 05 Y:2023 05 2023 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $35,027 $264,000 Not Implemented
UU0222 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,896 $2,400 Implemented
UU0222 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $37,496 $421,400 Not Implemented
UU0222 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,681 $1,740 Not Implemented
UU0222 # 01 Y:2023 01 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,013 $540 Implemented
UU0214 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,274 $495 Implemented
UU0214 # 07 Y:2023 07 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $24,046 $226,100 Not Implemented
UU0214 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $701 $1,150 Not Implemented
UU0214 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $550 $1,558 Implemented
UU0214 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,776 $6,969 Implemented
UU0214 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,069 $17,638 Implemented
UU0214 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $14,031 $23,302 Implemented
UU0214 # 08 Y:2023 08 2023 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $23,820 $214,625 Not Implemented
UU0190 # 04 Y:2021 04 2021 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $2,942 $2,900 Not Implemented
UU0190 # 02 Y:2021 02 2021 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $8,939 $3,000 Not Implemented
UU0190 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,184 $2,500 Not Implemented
UU0190 # 01 Y:2021 01 2021 INSULATE BARE EQUIPMENT $9,772 $5,582 Not Implemented
UU0190 # 05 Y:2021 05 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,058 $778 Not Implemented
UU0185 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $491 $255 Implemented
UU0185 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,960 $908 Not Implemented
UU0185 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,535 $2,600 Not Implemented
UU0185 # 01 Y:2021 01 2021 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $21,754 $64,000 Not Implemented
UU0185 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,814 $14,000 Implemented
UU0185 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,198 $3,400 Implemented