IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0046 # 03 Y:2014 03 2014 IMPROVE SPACE COMFORT CONDITIONING $5,525 $595 Implemented
WM0046 # 04 Y:2014 04 2014 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $15,846 $75,000 Not Implemented
BD0443 # 01 Y:2014 01 2014 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $119,363 $2,000 Not Implemented
BD0443 # 02 Y:2014 02 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,592 $225 Implemented
BD0443 # 03 Y:2014 03 2014 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,323 $11,250 Implemented
BD0443 # 04 Y:2014 04 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,701 $15,300 Not Implemented
BD0443 # 05 Y:2014 05 2014 USE SYNTHETIC LUBRICANT $13,419 $1,500 Not Implemented
BD0443 # 06 Y:2014 06 2014 INSTALL SKYLIGHTS $3,069 $5,312 Not Implemented
BD0443 # 07 Y:2014 07 2014 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,186 $20 Not Implemented
BD0443 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $1,163 $300 Not Implemented
BD0443 # 09 Y:2014 09 2014 SHUT OFF PILOTS IN STANDBY EQUIPMENT $175 $40 Implemented
AM0658 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $9,295 $29,980 Implemented
AM0658 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,680 $1,480 Implemented
AM0658 # 03 Y:2014 03 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $37,816 $6,000 Implemented
AM0658 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,645 $31,290 Implemented
AM0658 # 05 Y:2014 05 2014 APPLY FOR INVESTMENT INCENTIVES $3,746 $0 Implemented
AM0658 # 06 Y:2014 06 2014 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,360 $2,300 Implemented
AM0658 # 07 Y:2014 07 2014 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $3,155 $135 Implemented
AM0658 # 08 Y:2014 08 2014 USE SYNTHETIC LUBRICANT $1,565 $0 Implemented
AM0658 # 09 Y:2014 09 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,460 $175 Implemented
AM0658 # 10 Y:2014 10 2014 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $1,395 $9,280 Not Implemented
AM0658 # 11 Y:2014 11 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,345 $25 Implemented
AM0658 # 12 Y:2014 12 2014 USE PHOTOCELL CONTROLS $850 $150 Implemented
AM0658 # 13 Y:2014 13 2014 INSTALL OCCUPANCY SENSORS $550 $815 Implemented
SF0447 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,814 $70 Not Implemented