IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0465 # 09 Y:2013 09 2013 DEVELOP A REPAIR/REPLACE POLICY $174 $415 Implemented
WV0465 # 10 Y:2013 10 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $155 $90 Implemented
UD0875 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,925 $4,300 Not Implemented
UD0875 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,208 $1,000 Not Implemented
UD0875 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,013 $0 Implemented
UD0875 # 04 Y:2013 04 2013 HEAT TREAT PARTS ONLY TO REQUIRED SPECIFICATIONS OR STANDARDS $10,323 $0 Not Implemented
UD0875 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,804 $5,000 Not Implemented
UD0875 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $4,345 $1,205 Not Implemented
MZ0103 # 01 Y:2013 01 2013 USE RADIANT HEATER FOR SPOT HEATING $18,508 $10,648 Not Implemented
MZ0103 # 02 Y:2013 02 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,181 $14,224 Not Implemented
MZ0103 # 03 Y:2013 03 2013 INSULATE BARE EQUIPMENT $8,638 $4,954 Not Implemented
MZ0103 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $1,481 $1,540 Not Implemented
MZ0103 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $995 $27 Implemented
MZ0103 # 06 Y:2013 06 2013 COVER OPEN TANKS $993 $85 Not Implemented
MZ0103 # 07 Y:2013 07 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $438 $168 Not Implemented
MZ0103 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $429 $160 Implemented
MZ0103 # 09 Y:2013 09 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $417 $400 Not Implemented
MZ0103 # 10 Y:2013 10 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $415 $156 Implemented
DL0100 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,567 $100 Implemented
DL0100 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,275 $0 Implemented
DL0100 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,698 $3,500 Implemented
DL0100 # 04 Y:2013 04 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,094 $2,000 Not Implemented
DL0100 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,271 $49,280 Not Implemented
DL0100 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,455 $20,000 Implemented
DL0100 # 07 Y:2013 07 2013 TREAT AND REUSE RINSE WATERS $7,121 $10,000 Implemented