IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0216 # 05 Y:2012 05 2012 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,128 $500 Implemented
MI0216 # 06 Y:2012 06 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $853 $3,656 Implemented
UA0073 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,345 $7,808 Not Implemented
UA0073 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $428 $1,100 Implemented
UA0073 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,335 $28,658 Not Implemented
UA0073 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $3,261 $2,173 Implemented
UA0073 # 05 Y:2012 05 2012 ISOLATE HOT OR COLD EQUIPMENT $25,253 $12,880 Not Implemented
CO0653 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,900 $31,760 Not Implemented
CO0653 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,630 $800 Implemented
CO0653 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,230 $91,620 Not Implemented
CO0653 # 04 Y:2011 04 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,380 $25,810 Not Implemented
WV0439 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $67,687 $83,338 Not Implemented
WV0439 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $48,688 $48,160 Not Implemented
WV0439 # 03 Y:2011 03 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $47,442 $26,920 Not Implemented
WV0439 # 04 Y:2011 04 2011 DEVELOP A REPAIR/REPLACE POLICY $23,664 $1,202 Implemented
WV0439 # 05 Y:2011 05 2011 UPGRADE CONTROLS ON COMPRESSORS $22,385 $30,600 Not Implemented
WV0439 # 06 Y:2011 06 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $20,648 $4,000 Implemented
WV0439 # 07 Y:2011 07 2011 IMPROVE LUBRICATION PRACTICES $12,205 $8,311 Not Implemented
WV0439 # 08 Y:2011 08 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,735 $96 Implemented
WV0439 # 09 Y:2011 09 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,194 $468 Implemented
WV0439 # 10 Y:2011 10 2011 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,477 $144 Implemented
WV0439 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $4,234 $972 Implemented
WV0439 # 12 Y:2011 12 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,745 $7,360 Not Implemented
WV0439 # 13 Y:2011 13 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,536 $9,580 Not Implemented
WV0439 # 14 Y:2011 14 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,083 $3,000 Implemented