IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0892 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $255 $1,000 n/a
AM0892 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $711 $506 n/a
AM0892 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $15,525 $136,100 n/a
AM0892 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $248 $800 n/a
IC0292 # 01 Y:2024 01 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $434 $0 Implemented
IC0292 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,518 $9,738 Implemented
IC0292 # 03 Y:2024 03 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,811 $17,313 Not Implemented
IC0292 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $130,075 $1,202,972 Not Implemented
IC0292 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,838 $0 Not Implemented
IC0292 # 06 Y:2024 06 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,786 $0 Implemented
IC0292 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $19,216 $10,388 Implemented
IC0292 # 08 Y:2024 08 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,681 $163,749 Not Implemented
DL0232 # 01 Y:2024 01 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,952 $0 n/a
DL0232 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $4,060 $166 n/a
DL0232 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $848 $0 n/a
DL0232 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,563 $0 n/a
DL0232 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $10,552 $112 n/a
DL0232 # 06 Y:2024 06 2024 INSTALL TIMERS AND/OR THERMOSTATS $7,288 $84 n/a
DL0232 # 07 Y:2024 07 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,850 $1,637 n/a
DL0232 # 08 Y:2024 08 2024 RECOVER WASTE HEAT FROM EQUIPMENT $2,946 $10,000 n/a
DL0232 # 09 Y:2024 09 2024 RECOVER WASTE HEAT FROM EQUIPMENT $9,568 $10,000 n/a
DL0232 # 10 Y:2024 10 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $546 $0 n/a
DL0232 # 11 Y:2024 11 2024 INSULATE BARE EQUIPMENT $500 $340 n/a
DL0232 # 12 Y:2024 12 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,886 $5,000 n/a
DL0232 # 13 Y:2024 13 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,930 $7,995 n/a