Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
63
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0453 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,037 | $1,500 | Not Implemented |
IA0453 # 09 Y:2010 | 09 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,215 | $3,400 | Implemented |
IA0453 # 08 Y:2010 | 08 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $678 | $81 | Implemented |
IA0453 # 07 Y:2010 | 07 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $570 | $530 | Not Implemented |
IA0453 # 05 Y:2010 | 05 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $203 | $25 | Not Implemented |
IA0453 # 04 Y:2010 | 04 | 2010 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,525 | $11,586 | Implemented |
IA0453 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $1,082 | $1,037 | Implemented |
IA0453 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,157 | $19,968 | Implemented |
IA0453 # 03 Y:2010 | 03 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,755 | $24,540 | Not Implemented |
IA0446 # 08 Y:2009 | 08 | 2009 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $23,136 | $15,000 | Not Implemented |
IA0446 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,768 | $5,819 | Implemented |
IA0446 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,368 | $32,570 | Implemented |
IA0446 # 05 Y:2009 | 05 | 2009 | INSTALL OCCUPANCY SENSORS | $374 | $876 | Implemented |
IA0446 # 06 Y:2009 | 06 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,146 | $268 | Implemented |
IA0446 # 07 Y:2009 | 07 | 2009 | COVER OPEN TANKS | $26,317 | $20,000 | Not Implemented |
IA0446 # 14 Y:2009 | 14 | 2009 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $505 | $1,000 | Not Implemented |
IA0446 # 15 Y:2009 | 15 | 2009 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $333 | $213 | Not Implemented |
IA0446 # 16 Y:2009 | 16 | 2009 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $16,258 | $40,000 | Implemented |
IA0446 # 17 Y:2009 | 17 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,399 | $1,461 | Not Implemented |
IA0446 # 18 Y:2009 | 18 | 2009 | TURN OFF STEAM TRACING DURING MILD WEATHER | $957 | $260 | Implemented |
IA0446 # 19 Y:2009 | 19 | 2009 | AIR CONDITION ONLY SPACE NECESSARY | $1,847 | $3,725 | Not Implemented |
IA0446 # 20 Y:2009 | 20 | 2009 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $943 | $2,600 | Not Implemented |
IA0446 # 21 Y:2009 | 21 | 2009 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $2,298 | $115 | Implemented |
IA0446 # 22 Y:2009 | 22 | 2009 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $19,469 | $15,000 | Implemented |
IA0446 # 23 Y:2009 | 23 | 2009 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,312 | $2,060 | Implemented |