IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

763

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0807 # 14 Y:2009 14 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,896 $0 Not Implemented
UD0807 # 15 Y:2009 15 2009 INSULATE BARE EQUIPMENT $3,086 $2,700 Not Implemented
UD0807 # 16 Y:2009 16 2009 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,970 $2,000 Not Implemented
UD0807 # 17 Y:2009 17 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,776 $2,533 Implemented
UD0792 # 01 Y:2009 01 2009 Wind Power $1,103,774 $5,850,000 Not Implemented
UD0792 # 02 Y:2009 02 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,846 $92,500 Not Implemented
UD0792 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $13,922 $4,000 Not Implemented
UD0792 # 04 Y:2009 04 2009 INSULATE BARE EQUIPMENT $12,029 $2,640 Not Implemented
UD0792 # 05 Y:2009 05 2009 OPTIMIZE PLANT POWER FACTOR $4,640 $12,000 Not Implemented
UD0792 # 06 Y:2009 06 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,270 $8,700 Not Implemented
UD0792 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,350 $1,000 Not Implemented
UD0792 # 08 Y:2009 08 2009 INSULATE BARE EQUIPMENT $2,010 $900 Not Implemented
UD0792 # 09 Y:2009 09 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,247 $1,000 Not Implemented
UD0792 # 10 Y:2009 10 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,067 $5,170 Not Implemented
UD0792 # 11 Y:2009 11 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,050 $0 Not Implemented
UD0791 # 01 Y:2009 01 2009 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $180,324 $20,000 Implemented
UD0791 # 02 Y:2009 02 2009 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $66,274 $0 Implemented
UD0791 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,743 $28,000 Not Implemented
UD0791 # 04 Y:2009 04 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,848 $0 Implemented
UD0791 # 05 Y:2009 05 2009 PAY BILLS ON TIME TO AVOID LATE FEES $11,737 $0 Implemented
UD0791 # 06 Y:2009 06 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $11,734 $2,358 Not Implemented
UD0791 # 07 Y:2009 07 2009 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,202 $336 Implemented
UD0791 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,772 $15,000 Not Implemented
UD0791 # 09 Y:2009 09 2009 UPGRADE CONTROLS ON COMPRESSORS $7,364 $15,000 Not Implemented
UD0791 # 10 Y:2009 10 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,648 $2,164 Implemented