IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0098 # 02 Y:2005 02 2005 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $7,463 $111 Implemented
MI0098 # 03 Y:2005 03 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,950 $1,910 Implemented
MI0098 # 04 Y:2005 04 2005 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,754 $4,360 Not Implemented
MI0098 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $901 $380 Implemented
MI0098 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $301 $400 Implemented
AS0391 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $71,356 $27,044 Not Implemented
AS0391 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $56,937 $10,000 Not Implemented
AS0391 # 03 Y:2005 03 2005 DEVELOP STANDARD OPERATING PROCEDURES $121,316 $80,000 Not Implemented
AS0391 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,082 $14,973 Not Implemented
AS0391 # 05 Y:2005 05 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $14,058 $5,000 Not Implemented
AS0391 # 06 Y:2005 06 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $14,162 $625 Not Implemented
AS0391 # 07 Y:2005 07 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,974 $2,667 Not Implemented
AS0391 # 08 Y:2005 08 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,299 $3,287 Not Implemented
NC0306 # 01 Y:2004 01 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $96,975 $360,700 Not Implemented
NC0306 # 02 Y:2004 02 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $86,931 $100,000 n/a
NC0306 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $7,527 $1,600 Implemented
NC0306 # 04 Y:2004 04 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $10,305 $5,000 Implemented
NC0306 # 05 Y:2004 05 2004 OPERATE BOILERS ON HIGH FIRE SETTING $6,289 $2,100 Not Implemented
NC0306 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $204 $79 Not Implemented
NC0306 # 07 Y:2004 07 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,785 $100 Implemented
IA0357 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $1,879 $2,445 Implemented
IA0357 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,225 $349 Implemented
IA0357 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,125 $25 Not Implemented
IA0357 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $657 $262 Implemented
IA0357 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,027 $23 Implemented