IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,061

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0318 # 04 Y:2003 04 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,439 $2,619 Not Implemented
UF0318 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,202 $0 Implemented
UF0318 # 06 Y:2003 06 2003 INSTALL OCCUPANCY SENSORS $1,117 $852 Not Implemented
UF0318 # 07 Y:2003 07 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $11,077 $16,791 Not Implemented
UF0318 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,449 $0 Implemented
UF0318 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,037 $13,339 Implemented
UF0318 # 10 Y:2003 10 2003 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,364 $2,358 Not Implemented
UF0318 # 11 Y:2003 11 2003 MAINTAIN MACHINES TO REDUCE LEAKS $77,760 $14,000 Implemented
UF0318 # 12 Y:2003 12 2003 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,000 $8,200 Implemented
WV0259 # 01 Y:2003 01 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $217 $450 Implemented
WV0259 # 02 Y:2003 02 2003 USE OPTIMUM THICKNESS INSULATION $2,207 $375 Not Implemented
WV0259 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,449 $10,381 Implemented
WV0259 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $144 $136 Implemented
WV0259 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,897 $50 Implemented
WV0259 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $185 Not Implemented
WV0259 # 07 Y:2003 07 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,930 $250 Implemented
WV0259 # 08 Y:2003 08 2003 INSULATE BARE EQUIPMENT $12,370 $1,015 Not Implemented
WV0259 # 09 Y:2003 09 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,414 $420 Not Implemented
WV0259 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,727 $250 Implemented
WV0259 # 11 Y:2003 11 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,126 $800 Implemented
WV0259 # 12 Y:2003 12 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $217 $50 Implemented
MI0053 # 01 Y:2003 01 2003 METER WASTE WATER $1,881 $1,454 Not Implemented
MI0053 # 02 Y:2003 02 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $35,000 $7,660 Implemented
MI0053 # 03 Y:2003 03 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,563 $654 Not Implemented
MI0053 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $7,089 $885 Not Implemented