IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0064 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,520 $8,600 Implemented
MZ0064 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $12,142 $3,680 Implemented
MZ0064 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,612 $0 Implemented
MZ0064 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58,225 $57,800 Implemented
MZ0064 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,083 $6,900 Implemented
LL0304 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $101 $70 Implemented
LL0304 # 06 Y:2008 06 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $823 $1,246 Not Implemented
LL0304 # 05 Y:2008 05 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,456 $825 Not Implemented
LL0304 # 04 Y:2008 04 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,714 $30 Not Implemented
LL0304 # 03 Y:2008 03 2008 INSULATE BARE EQUIPMENT $9,892 $1,118 Not Implemented
LL0304 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,876 $20,949 Not Implemented
LL0304 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $59,266 $14,840 Implemented
OK0752 # 04 Y:2007 04 2007 USE RADIANT HEATER FOR SPOT HEATING $3,226 $5,328 Not Implemented
OK0752 # 09 Y:2007 09 2007 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $20,273 $2,500 Not Implemented
OK0752 # 08 Y:2007 08 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,548 $0 Not Implemented
OK0752 # 07 Y:2007 07 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,114 $7,711 Not Implemented
OK0752 # 06 Y:2007 06 2007 UPGRADE CONTROLS ON COMPRESSORS $239 $70 Not Implemented
OK0752 # 05 Y:2007 05 2007 USE RADIANT HEATER FOR SPOT HEATING $9,113 $12,000 Not Implemented
MS0321 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $854 $455 Not Implemented
OK0752 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,978 $1,000 Not Implemented
OK0752 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $499 $8,116 Not Implemented
OK0752 # 02 Y:2007 02 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,360 $0 Not Implemented
MS0321 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,455 $2,724 Not Implemented
OK0752 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $3,323 $2,319 Not Implemented
MS0321 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,742 $306 Implemented