Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,072
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0210 # 04 Y:2022 | 04 | 2022 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $264,494 | $0 | Not Implemented |
DL0210 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $93,984 | $5,553 | Not Implemented |
DL0210 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $17,648 | $50,000 | Not Implemented |
DL0210 # 07 Y:2022 | 07 | 2022 | REDUCE EXCESSIVE BOILER BLOWDOWN | $17,995 | $0 | Not Implemented |
DL0210 # 08 Y:2022 | 08 | 2022 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,443 | $20,000 | Not Implemented |
DL0210 # 09 Y:2022 | 09 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $86,400 | $1,000,000 | Not Implemented |
MZ0335 # 01 Y:2022 | 01 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $558 | $480 | Implemented |
MZ0335 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,654 | $7,600 | Implemented |
MZ0335 # 03 Y:2022 | 03 | 2022 | INSULATE BARE EQUIPMENT | $1,834 | $680 | Implemented |
MZ0335 # 04 Y:2022 | 04 | 2022 | INSTALL OCCUPANCY SENSORS | $701 | $1,200 | Implemented |
MZ0335 # 05 Y:2022 | 05 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $106,813 | $957,388 | Not Implemented |
MZ0335 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $759 | $1,330 | Implemented |
MZ0335 # 07 Y:2022 | 07 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,141 | $9,100 | Not Implemented |
MZ0335 # 08 Y:2022 | 08 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $449 | $200 | Not Implemented |
CO0744 # 01 Y:2022 | 01 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $26,159 | $136,687 | n/a |
CO0744 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $881 | $2,407 | n/a |
CO0744 # 03 Y:2022 | 03 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,175 | $7,076 | n/a |
CO0744 # 04 Y:2022 | 04 | 2022 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,847 | $9,768 | n/a |
CO0744 # 05 Y:2022 | 05 | 2022 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $210,000 | $58,000 | n/a |
CO0744 # 06 Y:2022 | 06 | 2022 | CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS | $60,192 | $4,219 | n/a |
CO0744 # 07 Y:2022 | 07 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,731 | $3,276 | n/a |
WM0184 # 01 Y:2022 | 01 | 2022 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,492 | $6,200 | Not Implemented |
WM0184 # 02 Y:2022 | 02 | 2022 | INSTALL OCCUPANCY SENSORS | $2,076 | $1,190 | Not Implemented |
WM0184 # 03 Y:2022 | 03 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $1,517 | $3,265 | Not Implemented |
WM0184 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $844 | $850 | Not Implemented |