Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
203
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0981 # 02 Y:2018 | 02 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,704 | $50 | Not Implemented |
UD0981 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,028 | $500 | Implemented |
UD0981 # 04 Y:2018 | 04 | 2018 | OPTIMIZE PLANT POWER FACTOR | $12,524 | $8,000 | Not Implemented |
UD0981 # 05 Y:2018 | 05 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,753 | $700 | Not Implemented |
UD0981 # 06 Y:2018 | 06 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,343 | $5,021 | Not Implemented |
UD0981 # 07 Y:2018 | 07 | 2018 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,343 | $5,021 | Not Implemented |
UD0981 # 08 Y:2018 | 08 | 2018 | INSULATE BARE EQUIPMENT | $6,131 | $4,525 | Implemented |
UD0981 # 09 Y:2018 | 09 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,998 | $4,275 | Not Implemented |
UD0981 # 10 Y:2018 | 10 | 2018 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $19,398 | $45,500 | Not Implemented |
UM0488 # 05 Y:2017 | 05 | 2017 | INSTALL OCCUPANCY SENSORS | $1,958 | $2,400 | n/a |
UM0488 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,992 | $8,978 | n/a |
UM0488 # 03 Y:2017 | 03 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $931 | $1,500 | n/a |
UM0488 # 02 Y:2017 | 02 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,383 | $300 | n/a |
UM0488 # 01 Y:2017 | 01 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,972 | $3,000 | n/a |
UM0470 # 04 Y:2016 | 04 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $819 | $3,700 | n/a |
UM0470 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $1,272 | $2,500 | n/a |
UM0470 # 02 Y:2016 | 02 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,012 | $5,000 | n/a |
UM0470 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,893 | $2,000 | n/a |
UM0447 # 03 Y:2014 | 03 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,058 | $2,500 | Implemented |
UM0447 # 02 Y:2014 | 02 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $27,617 | $28,500 | Not Implemented |
UM0447 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,946 | $5,000 | Implemented |
UM0447 # 05 Y:2014 | 05 | 2014 | REPLACE BOILER | $33,249 | $3,000 | Not Implemented |
UM0447 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,906 | $1,000 | Implemented |
UM0429 # 02 Y:2013 | 02 | 2013 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,926 | $1,000 | Not Implemented |
UM0429 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,689 | $59,040 | Implemented |