IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0530 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $45,649 $8,838 Implemented
WV0530 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,558 $72,000 Implemented
WV0530 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,714 $16,453 Implemented
WV0530 # 04 Y:2016 04 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $15,987 $1,000 Implemented
WV0530 # 05 Y:2016 05 2016 DEVELOP A REPAIR/REPLACE POLICY $8,519 $1,125 Not Implemented
WV0530 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,493 $128 Not Implemented
WV0530 # 07 Y:2016 07 2016 UPGRADE CONTROLS ON COMPRESSORS $6,845 $5,000 Implemented
WV0530 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $6,395 $27,920 Not Implemented
WV0530 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,409 $1,036 Implemented
WV0530 # 10 Y:2016 10 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,195 $8,450 Implemented
WV0516 # 01 Y:2015 01 2015 UPGRADE CONTROLS ON COMPRESSORS $10,801 $12,000 Implemented
WV0516 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,983 $2,875 Implemented
WV0516 # 03 Y:2015 03 2015 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,046 $1,000 Implemented
WV0516 # 04 Y:2015 04 2015 INSULATE BARE EQUIPMENT $1,885 $234 Not Implemented
WV0516 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,706 $1,288 Implemented
WV0516 # 06 Y:2015 06 2015 DEVELOP A REPAIR/REPLACE POLICY $1,304 $595 Not Implemented
WV0516 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,248 $4,483 Implemented
WV0516 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,057 $105 Implemented
WV0481 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,697 $36,851 Not Implemented
WV0481 # 02 Y:2014 02 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,611 $72,000 Not Implemented
WV0481 # 03 Y:2014 03 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,571 $1,000 Implemented
WV0481 # 04 Y:2014 04 2014 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $5,404 $0 Not Implemented
WV0481 # 05 Y:2014 05 2014 DEVELOP A REPAIR/REPLACE POLICY $3,317 $381 Implemented
WV0481 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $3,285 $4,251 Implemented
WV0481 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,147 $2,480 Not Implemented