Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,072
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0280 # 08 Y:2019 | 08 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,754 | $3,520 | Not Implemented |
MZ0280 # 09 Y:2019 | 09 | 2019 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,436 | $8,160 | Not Implemented |
MZ0280 # 10 Y:2019 | 10 | 2019 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,747 | $6,080 | Not Implemented |
MZ0280 # 11 Y:2019 | 11 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,072 | $1,664 | Not Implemented |
MZ0280 # 12 Y:2019 | 12 | 2019 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,153 | $550 | Not Implemented |
MA0805 # 01 Y:2019 | 01 | 2019 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $96,513 | $144,000 | Not Implemented |
MA0805 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $82,405 | $128,486 | Implemented |
MA0805 # 03 Y:2019 | 03 | 2019 | USE SOLAR HEAT FOR HEAT | $77,280 | $383,955 | Not Implemented |
MA0805 # 04 Y:2019 | 04 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $40,486 | $165,914 | Not Implemented |
MA0805 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $28,514 | $32,800 | Implemented |
MA0805 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $25,552 | $7,916 | Not Implemented |
MA0805 # 07 Y:2019 | 07 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,131 | $5,222 | Not Implemented |
MA0805 # 08 Y:2019 | 08 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,775 | $200 | Implemented |
TR0014 # 01 Y:2019 | 01 | 2019 | PAY UTILITY BILLS ON TIME | $2,781 | $0 | Implemented |
TR0014 # 02 Y:2019 | 02 | 2019 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,582 | $0 | Implemented |
TR0014 # 03 Y:2019 | 03 | 2019 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $9,971 | $8,500 | Implemented |
TR0014 # 04 Y:2019 | 04 | 2019 | METER WASTE WATER | $719 | $1,511 | Implemented |
TR0014 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,996 | $8,838 | Implemented |
MA0806 # 01 Y:2019 | 01 | 2019 | USE SOLAR HEAT FOR HEAT | $131,256 | $566,995 | Implemented |
MA0806 # 02 Y:2019 | 02 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $22,287 | $750 | Implemented |
MA0806 # 03 Y:2019 | 03 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,496 | $71,032 | Not Implemented |
MA0806 # 04 Y:2019 | 04 | 2019 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,289 | $15,750 | Implemented |
OK1011 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,499 | $1,898 | Implemented |
OK1011 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,528 | $8,106 | Not Implemented |
OK1011 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,937 | $15,573 | Implemented |