IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,072

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0306 # 11 Y:2017 11 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $711 $120 Implemented
MI0306 # 12 Y:2017 12 2017 INSTALL OCCUPANCY SENSORS $612 $1,630 Implemented
SU0432 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,735 $0 Not Implemented
SU0432 # 02 Y:2017 02 2017 DISCONNECT BALLASTS $1,881 $0 Not Implemented
SU0432 # 03 Y:2017 03 2017 ELIMINATE/REDUCE AN OPERATION $22,179 $350 Not Implemented
SU0432 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $906 $968 Not Implemented
SU0432 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,680 $5,451 Not Implemented
SU0432 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,489 $22,737 Not Implemented
SU0432 # 07 Y:2017 07 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $115 $551 Not Implemented
UD0961 # 01 Y:2017 01 2017 USE RADIANT HEATER FOR SPOT HEATING $23,931 $14,250 Not Implemented
UD0961 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,308 $0 Not Implemented
UD0961 # 03 Y:2017 03 2017 DEVELOP A REPAIR/REPLACE POLICY $1,272 $4,748 Not Implemented
UD0961 # 04 Y:2017 04 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,969 $23,750 Not Implemented
UD0961 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,937 $1,000 Not Implemented
UD0961 # 06 Y:2017 06 2017 REDUCE FLUID FLOW RATES $5,273 $1,000 Not Implemented
UD0961 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,802 $3,700 Not Implemented
UD0961 # 08 Y:2017 08 2017 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $18,094 $103,500 Not Implemented
BD0492 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,166 $21,060 n/a
BD0492 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $10,912 $4,050 n/a
BD0492 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,352 $2,600 n/a
BD0492 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,305 $500 n/a
BD0492 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,299 $6,032 n/a
BD0492 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,039 $20 n/a
BD0492 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $476 $600 n/a
BD0492 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $529 $75 n/a