IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

94

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1094 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,672 $2,688 Not Implemented
OK1094 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,917 $22,000 Implemented
OK1094 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $573 $870 Implemented
OK1094 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,890 $94,115 Implemented
OK1094 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $93,859 $858,000 Not Implemented
OK1094 # 06 Y:2023 06 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,239 $12,700 Not Implemented
TT0241 # 07 Y:2020 07 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,304 $3,360 Implemented
TT0241 # 12 Y:2020 12 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $74 $269 Implemented
TT0241 # 10 Y:2020 10 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $404 $1,000 Implemented
TT0241 # 08 Y:2020 08 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,202 $20 Implemented
TT0241 # 09 Y:2020 09 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,651 $6,000 Implemented
TT0241 # 04 Y:2020 04 2020 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $18,441 $75,000 Implemented
TT0241 # 11 Y:2020 11 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $307 $680 Implemented
TT0241 # 03 Y:2020 03 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $49,818 $14,600 Implemented
TT0241 # 02 Y:2020 02 2020 UPGRADE CONTROLS ON COMPRESSORS $54,178 $300 Implemented
TT0241 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,106 $530 Implemented
TT0241 # 01 Y:2020 01 2020 RECOVER WASTE HEAT FROM EQUIPMENT $116,047 $13,220 Not Implemented
TT0241 # 06 Y:2020 06 2020 UPGRADE CONTROLS ON COMPRESSORS $4,203 $120 Not Implemented
OK0934 # 03 Y:2016 03 2016 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $134,039 $1,300 Implemented
OK0934 # 06 Y:2016 06 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,069 $10,000 Not Implemented
OK0934 # 01 Y:2016 01 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $27,456 $25,000 Not Implemented
OK0934 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $63,243 $3,161 Implemented
OK0934 # 05 Y:2016 05 2016 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,990 $0 Not Implemented
OK0934 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,615 $915 Not Implemented
OK0929 # 03 Y:2015 03 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82,236 $72,000 Not Implemented