IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
NAICS 3261 Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0771 # 02 Y:2023 02 2023 REDUCE OR ELIMINATE WASTE $56,000 $850 Not Implemented
OR0771 # 01 Y:2023 01 2023 IMPROVE LUBRICATION PRACTICES $13,223 $0 Not Implemented
OR0771 # 03 Y:2023 03 2023 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $30,696 $13,620 Not Implemented
OR0771 # 05 Y:2023 05 2023 FILTER AND REUSE HYDRAULIC OIL $21,755 $80,000 Not Implemented
OR0771 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $5,338 $7,581 Not Implemented
OR0736 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,946 $3,000 Implemented
OR0736 # 05 Y:2020 05 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $17,948 $212,663 Not Implemented
OR0736 # 01 Y:2020 01 2020 USE SYNTHETIC LUBRICANT $17,895 $672 Not Implemented
OR0736 # 04 Y:2020 04 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $922 $114 Implemented
OR0736 # 03 Y:2020 03 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,008 $1,549 Implemented
OR0600 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,704 $500 Implemented
OR0600 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,835 $2,724 Implemented
OR0600 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,399 $560 Implemented
OR0600 # 06 Y:2012 06 2012 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $6,653 $385 Implemented
OR0600 # 05 Y:2012 05 2012 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES $4,720 $0 Not Implemented
OR0600 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $940 $392 Implemented
OR0600 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $334 $0 Implemented
OR0600 # 01 Y:2012 01 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,559 $2,500 Not Implemented
OR0585 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,690 $2,000 Not Implemented
OR0585 # 01 Y:2012 01 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,836 $7,417 Not Implemented
OR0585 # 10 Y:2012 10 2012 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,580 $0 Not Implemented
OR0585 # 09 Y:2012 09 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $7,083 $47,838 Not Implemented
OR0585 # 08 Y:2012 08 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $16,379 $16,379 Not Implemented
OR0585 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $13,449 $24,282 Not Implemented
OR0585 # 06 Y:2012 06 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,942 $1,000 Not Implemented