Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
197
matching recommendationsNAICS | 3261 | Plastics Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0339 # 08 Y:2025 | 08 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,566 | $850 | n/a |
TT0339 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,876 | $5,625 | n/a |
TT0339 # 09 Y:2025 | 09 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $868 | $100 | n/a |
TT0339 # 03 Y:2025 | 03 | 2025 | OPTIMIZE PLANT POWER FACTOR | $31,076 | $9,750 | n/a |
TT0339 # 07 Y:2025 | 07 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,575 | $11,250 | n/a |
TT0339 # 02 Y:2025 | 02 | 2025 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $33,333 | $35,000 | n/a |
TT0339 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT FOR HEAT | $49,796 | $276,634 | n/a |
TT0339 # 05 Y:2025 | 05 | 2025 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $22,030 | $20,000 | n/a |
TT0339 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,795 | $10,920 | n/a |
NT0047 # 07 Y:2025 | 07 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,083 | $1,434 | n/a |
NT0047 # 08 Y:2025 | 08 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $852 | $0 | n/a |
NT0047 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $89,410 | $0 | n/a |
NT0047 # 01 Y:2025 | 01 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $166,705 | $320,438 | n/a |
NT0047 # 05 Y:2025 | 05 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $26,918 | $27,300 | n/a |
NT0047 # 04 Y:2025 | 04 | 2025 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $61,852 | $120,692 | n/a |
NT0047 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $87,586 | $164,542 | n/a |
NT0047 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $25,099 | $4,224 | n/a |
MU0069 # 10 Y:2025 | 10 | 2025 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $188 | $1,500 | n/a |
MU0069 # 02 Y:2025 | 02 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $24,311 | $129,488 | n/a |
MU0069 # 06 Y:2025 | 06 | 2025 | KEEP EQUIPMENT CLEAN | $3,684 | $0 | n/a |
MU0069 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $27,682 | $5,553 | n/a |
MU0069 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $674 | $120 | n/a |
MU0069 # 03 Y:2025 | 03 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,826 | $669 | n/a |
MU0069 # 07 Y:2025 | 07 | 2025 | USE PHOTOCELL CONTROLS | $1,214 | $754 | n/a |
MU0069 # 08 Y:2025 | 08 | 2025 | USE PHOTOCELL CONTROLS | $982 | $0 | n/a |