Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0335 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $558 $480 Implemented
MZ0335 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $1,330 Implemented
MZ0335 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,141 $9,100 Not Implemented
MZ0335 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $449 $200 Not Implemented
MZ0335 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $4,654 $7,600 Implemented
MZ0335 # 03 Y:2022 03 2022 INSULATE BARE EQUIPMENT $1,834 $680 Implemented
MZ0335 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $701 $1,200 Implemented
MZ0335 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $106,813 $957,388 Not Implemented
MZ0147 # 02 Y:2014 02 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $63 $235 Implemented
MZ0147 # 01 Y:2014 01 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $871 $360 Implemented
MZ0147 # 03 Y:2014 03 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $63 $235 Implemented
MZ0147 # 04 Y:2014 04 2014 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $423 $470 Implemented
MZ0147 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,562 $42,645 Implemented
MZ0147 # 06 Y:2014 06 2014 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,184 $600 Implemented
MZ0147 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $9,950 $5,290 Not Implemented
MZ0147 # 08 Y:2014 08 2014 INSULATE BARE EQUIPMENT $2,616 $2,613 Not Implemented
MZ0147 # 10 Y:2014 10 2014 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,158 $250 Implemented
MZ0147 # 09 Y:2014 09 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,212 $420 Implemented
MZ0098 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,269 $850 Not Implemented
MZ0098 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,271 $1,283 Implemented
MZ0098 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,872 $400 Implemented
MZ0098 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $5,896 $3,000 Implemented
MZ0098 # 04 Y:2012 04 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,018 $250 Implemented
MZ0098 # 03 Y:2012 03 2012 USE RADIANT HEATER FOR SPOT HEATING $35,790 $36,000 Implemented
MZ0098 # 02 Y:2012 02 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,267 $26,000 Implemented