IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,122

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0801 # 07 Y:2005 07 2005 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $35,100 $15,000 Implemented
GT0801 # 08 Y:2005 08 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,320 $10,000 Not Implemented
GT0801 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,950 $6,600 Not Implemented
GT0801 # 10 Y:2005 10 2005 COMBINE UTILITY METERS $12,370 $0 Not Implemented
BD0284 # 01 Y:2005 01 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,372 $800 Implemented
BD0284 # 02 Y:2005 02 2005 USE SYNTHETIC LUBRICANT $7,827 $2,200 Not Implemented
BD0284 # 03 Y:2005 03 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,583 $18,820 Implemented
BD0284 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,801 $1,464 Implemented
BD0284 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $360 Implemented
BD0284 # 06 Y:2005 06 2005 USE RADIANT HEATER FOR SPOT HEATING $7,427 $4,800 Implemented
BD0284 # 07 Y:2005 07 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $911 $0 Not Implemented
BD0284 # 08 Y:2005 08 2005 INSTALL OCCUPANCY SENSORS $967 $900 Implemented
BD0284 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $3,546 $2,240 Implemented
WI0486 # 01 Y:2005 01 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $20,351 $18,000 Not Implemented
WI0486 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,915 $1,280 Implemented
WI0486 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,600 $7,840 Not Implemented
WI0486 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,465 $0 Implemented
WI0486 # 05 Y:2005 05 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,086 $780 Implemented
WI0486 # 06 Y:2005 06 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,509 $700 Not Implemented
WI0486 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $671 $300 Not Implemented
WI0486 # 08 Y:2005 08 2005 INSTALL TIMERS AND/OR THERMOSTATS $453 $800 Implemented
NC0306 # 01 Y:2004 01 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $96,975 $360,700 Not Implemented
NC0306 # 02 Y:2004 02 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $86,931 $100,000 n/a
NC0306 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $7,527 $1,600 Implemented
NC0306 # 04 Y:2004 04 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $10,305 $5,000 Implemented