IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,122

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0335 # 03 Y:2022 03 2022 INSULATE BARE EQUIPMENT $1,834 $680 Implemented
MZ0335 # 04 Y:2022 04 2022 INSTALL OCCUPANCY SENSORS $701 $1,200 Implemented
MZ0335 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $106,813 $957,388 Not Implemented
MZ0335 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $759 $1,330 Implemented
MZ0335 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,141 $9,100 Not Implemented
MZ0335 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $449 $200 Not Implemented
WM0184 # 01 Y:2022 01 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,492 $6,200 Not Implemented
WM0184 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,076 $1,190 Not Implemented
WM0184 # 03 Y:2022 03 2022 USE RADIANT HEATER FOR SPOT HEATING $1,517 $3,265 Not Implemented
WM0184 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $844 $850 Not Implemented
WM0184 # 05 Y:2022 05 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $779 $1,030 Not Implemented
WM0184 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $592 $0 Not Implemented
WM0184 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $87 $54 Not Implemented
UW2202 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,645 $10,782 Implemented
UW2202 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,233 $12,913 Implemented
UW2202 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,538 $9,763 Implemented
UW2202 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $135,581 $876,160 Implemented
MI0406 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,298 $45,090 Implemented
MI0406 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,075 $5,674 Implemented
MI0406 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,550 $2,031 Implemented
MI0406 # 04 Y:2022 04 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,468 $15,450 Implemented
MI0406 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $5,579 $15,821 Implemented
MI0406 # 06 Y:2022 06 2022 ELIMINATE/REDUCE AN OPERATION $4,770 $960 Implemented
MI0406 # 07 Y:2022 07 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,016 $100 Not Implemented
MA0829 # 01 Y:2022 01 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $34,736 $24,400 Not Implemented