IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,122

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0491 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,028 $15,000 Not Implemented
LE0491 # 06 Y:2020 06 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,121 $36,000 Not Implemented
LE0491 # 07 Y:2020 07 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,795 $12,000 Not Implemented
LE0488 # 01 Y:2020 01 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $1,217 $40 Not Implemented
LE0488 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,201 $360 Implemented
LE0488 # 03 Y:2020 03 2020 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $82,690 $150,334 Implemented
LE0488 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,465 $13,000 Implemented
LE0488 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,995 $12,420 Implemented
LE0488 # 06 Y:2020 06 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $788 $2,200 Implemented
LE0488 # 07 Y:2020 07 2020 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $2,905 $9,300 Implemented
UD1009 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $32,116 $0 Implemented
UD1009 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,826 $1,000 Implemented
UD1009 # 03 Y:2020 03 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $78,282 $44,250 Not Implemented
UD1009 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,717 $4,388 Implemented
UD1009 # 05 Y:2020 05 2020 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $107,302 $83,000 Implemented
UD1009 # 06 Y:2020 06 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $100,517 $151,300 Not Implemented
UD1009 # 07 Y:2020 07 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $73,844 $147,736 Not Implemented
SD0590 # 01 Y:2019 01 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $12,001 $8,840 Not Implemented
SD0590 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,948 $0 Implemented
SD0590 # 03 Y:2019 03 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $880 $120 Implemented
SD0590 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $319 $585 Implemented
OK1017 # 01 Y:2019 01 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,604 $17,500 Not Implemented
OK1017 # 02 Y:2019 02 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $10,627 $231 Not Implemented
OK1017 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,220 $22,288 Not Implemented
OK1017 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,214 $3,590 Not Implemented