Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
66
matching recommendationsNAICS | 32611 | Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0276 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $1,869 | $2,547 | Not Implemented |
IC0276 # 10 Y:2023 | 10 | 2023 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $155,920 | $1,014,736 | Not Implemented |
IC0276 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $6,347 | $3,405 | Implemented |
IC0276 # 08 Y:2023 | 08 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $992 | $1,773 | Not Implemented |
IC0276 # 02 Y:2023 | 02 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $83,404 | $10,984 | Implemented |
IC0276 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,020 | $4,424 | Not Implemented |
IC0276 # 03 Y:2023 | 03 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $102,187 | $5,165 | Not Implemented |
IC0276 # 07 Y:2023 | 07 | 2023 | INSULATE BARE EQUIPMENT | $12,027 | $90 | Not Implemented |
IC0276 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $36,114 | $7,997 | Implemented |
IC0276 # 09 Y:2023 | 09 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $85,492 | $1,202,972 | Not Implemented |
IP0170 # 04 Y:2023 | 04 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $6,289 | $660 | Not Implemented |
IP0170 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $14,876 | $495 | Not Implemented |
IP0170 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,367 | $0 | Not Implemented |
IP0170 # 02 Y:2023 | 02 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,771 | $0 | Not Implemented |
IP0170 # 06 Y:2023 | 06 | 2023 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $590 | $113 | Not Implemented |
IP0170 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,696 | $4,266 | Not Implemented |
IP0170 # 10 Y:2023 | 10 | 2023 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $195 | $600 | Not Implemented |
IP0170 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $140 | $33 | Not Implemented |
IP0170 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,620 | $564 | Not Implemented |
IP0170 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,123 | $6,636 | Not Implemented |
UD0975 # 12 Y:2017 | 12 | 2017 | INSTALL OCCUPANCY SENSORS | $3,441 | $1,931 | Implemented |
UD0975 # 11 Y:2017 | 11 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $45,148 | $47,000 | Implemented |
UD0975 # 08 Y:2017 | 08 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,964 | $2,000 | Not Implemented |
UD0975 # 06 Y:2017 | 06 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,737 | $2,000 | Not Implemented |
UD0975 # 05 Y:2017 | 05 | 2017 | COVER OPEN TANKS | $29,884 | $2,350 | Not Implemented |