Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsNAICS | 32611 | Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0291 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,444 | $2,886 | Not Implemented |
BD0291 # 13 Y:2005 | 13 | 2005 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,744 | $2,500 | Not Implemented |
BD0291 # 12 Y:2005 | 12 | 2005 | INSTALL OCCUPANCY SENSORS | $1,620 | $2,000 | Not Implemented |
BD0291 # 11 Y:2005 | 11 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,162 | $2,000 | Not Implemented |
BD0291 # 10 Y:2005 | 10 | 2005 | USE RADIANT HEATER FOR SPOT HEATING | $2,257 | $2,500 | Not Implemented |
BD0291 # 09 Y:2005 | 09 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,677 | $0 | Not Implemented |
BD0291 # 08 Y:2005 | 08 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,134 | $2,200 | Not Implemented |
BD0291 # 07 Y:2005 | 07 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,582 | $11,250 | Not Implemented |
BD0291 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $6,678 | $1,000 | Not Implemented |
BD0291 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $7,030 | $2,850 | Not Implemented |
BD0291 # 04 Y:2005 | 04 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $11,415 | $13,500 | Not Implemented |
BD0291 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $18,984 | $17,000 | Not Implemented |
BD0291 # 01 Y:2005 | 01 | 2005 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $126,274 | $320,000 | Not Implemented |
BD0291 # 14 Y:2005 | 14 | 2005 | AUTOMATE PAYROLL SYSTEM | $2,950 | $0 | Not Implemented |
NC0316 # 01 Y:2005 | 01 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $18,271 | $87,125 | Not Implemented |
NC0316 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $327 | $100 | Implemented |
NC0316 # 02 Y:2005 | 02 | 2005 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $10,570 | $26,949 | Not Implemented |
NC0316 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $491 | $321 | Not Implemented |
GT0801 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,040 | $32,725 | Implemented |
GT0801 # 03 Y:2005 | 03 | 2005 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $72 | $0 | Implemented |
GT0801 # 02 Y:2005 | 02 | 2005 | USE PHOTOCELL CONTROLS | $7,520 | $32,480 | Not Implemented |
GT0801 # 06 Y:2005 | 06 | 2005 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $1,780 | $7,500 | Not Implemented |
GT0801 # 04 Y:2005 | 04 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $775 | $500 | Implemented |
GT0801 # 09 Y:2005 | 09 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,950 | $6,600 | Not Implemented |
GT0801 # 08 Y:2005 | 08 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $11,320 | $10,000 | Not Implemented |