IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
Reset
NAICS 32611 Plastics Packaging Materials and Unlaminated Film and Sheet Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0225 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,874 $0 Implemented
UU0225 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,047 $11,922 Implemented
UU0225 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,399 $15,200 Implemented
UU0225 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,851 $2,775 Implemented
UU0225 # 01 Y:2023 01 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $39,842 $126,388 Implemented
UL2306 # 03 Y:2023 03 2023 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,595 $12,891 Not Implemented
UL2306 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $103,804 $14,859 Not Implemented
UL2306 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $30,055 $314,019 Not Implemented
UL2306 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $336 $600 Implemented
UL2306 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,019 $0 Not Implemented
CC0018 # 06 Y:2023 06 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $95,279 $350,000 n/a
CC0018 # 05 Y:2023 05 2023 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $16,265 $70,000 n/a
CC0018 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,300 $0 n/a
CC0018 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,158 $10,000 n/a
CC0018 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $31,506 $10,000 n/a
CC0018 # 01 Y:2023 01 2023 INSULATE FEEDWATER TANK $2,497 $500 n/a
IC0282 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $132,518 $1,169,610 Not Implemented
IC0282 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,241 $4,067 Not Implemented
IC0282 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,637 $3,994 Implemented
IC0282 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,144 $7,160 Implemented
IC0281 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $109,160 $660,787 Not Implemented
IC0281 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,536 $7,857 Implemented
IC0281 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,327 $2,879 Not Implemented
IC0281 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $1,249 $804 Implemented
IC0281 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,197 $3,250 Implemented