Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
341
matching recommendationsNAICS | 326111 | Plastics Bag and Pouch Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0147 # 04 Y:2014 | 04 | 2014 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $423 | $470 | Implemented |
MZ0147 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,562 | $42,645 | Implemented |
MZ0147 # 06 Y:2014 | 06 | 2014 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $1,184 | $600 | Implemented |
MZ0147 # 07 Y:2014 | 07 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,950 | $5,290 | Not Implemented |
MZ0147 # 08 Y:2014 | 08 | 2014 | INSULATE BARE EQUIPMENT | $2,616 | $2,613 | Not Implemented |
MZ0147 # 09 Y:2014 | 09 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,212 | $420 | Implemented |
MZ0147 # 10 Y:2014 | 10 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,158 | $250 | Implemented |
MI0229 # 01 Y:2012 | 01 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $69,199 | $111,000 | Implemented |
MI0229 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,024 | $168,378 | Not Implemented |
MI0229 # 03 Y:2012 | 03 | 2012 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $26,164 | $22,464 | Implemented |
MI0229 # 04 Y:2012 | 04 | 2012 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,533 | $46,296 | Not Implemented |
MI0229 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,948 | $7,160 | Not Implemented |
MI0229 # 06 Y:2012 | 06 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $14,915 | $80 | Implemented |
MI0229 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,865 | $1,660 | Implemented |
MI0229 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,849 | $80 | Implemented |
MI0229 # 09 Y:2012 | 09 | 2012 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $5,382 | $385 | Implemented |
MI0229 # 10 Y:2012 | 10 | 2012 | INSTALL OCCUPANCY SENSORS | $2,325 | $480 | Implemented |
MI0229 # 11 Y:2012 | 11 | 2012 | INSTALL SKYLIGHTS | $2,117 | $3,000 | Implemented |
MI0229 # 12 Y:2012 | 12 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,297 | $460 | Implemented |
MI0229 # 13 Y:2012 | 13 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $624 | $1,852 | Implemented |
MI0224 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,266 | $11,960 | Implemented |
MI0224 # 02 Y:2012 | 02 | 2012 | INSULATE BARE EQUIPMENT | $14,666 | $2,135 | Not Implemented |
MI0224 # 03 Y:2012 | 03 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,947 | $12,324 | Implemented |
MI0224 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,323 | $3,480 | Implemented |
MI0224 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,130 | $1,660 | Implemented |