IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

233

matching recommendations
Reset
NAICS 326113 Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0301 # 14 Y:2010 14 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,029 $20,000 Implemented
LE0301 # 15 Y:2010 15 2010 INSTALL OCCUPANCY SENSORS $1,097 $2,035 Implemented
LE0301 # 16 Y:2010 16 2010 INSTALL TIMERS AND/OR THERMOSTATS $153 $1,000 Implemented
OK0777 # 01 Y:2009 01 2009 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $164,328 $490,000 Implemented
OK0777 # 02 Y:2009 02 2009 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $26,234 $0 Implemented
OK0777 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,136 $3,129 Implemented
OK0777 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $28,753 $33,300 Implemented
OK0777 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $2,638 $779 Implemented
OK0745 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,891 $360 Implemented
OK0745 # 03 Y:2007 03 2007 INSULATE BARE EQUIPMENT $13,884 $4,859 Implemented
OK0745 # 11 Y:2007 11 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $37,616 $286,361 Implemented
GT0835 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,131 $1,172 Implemented
GT0835 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $750 Implemented
LL0267 # 01 Y:2007 01 2007 INSULATE BARE EQUIPMENT $23,653 $3,315 Implemented
LL0267 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,794 $1,280 Implemented
WV0340 # 01 Y:2006 01 2006 REPAIR OR REPLACE STEAM TRAPS $80,134 $2,500 Implemented
WV0340 # 02 Y:2006 02 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $42,375 $27,500 Implemented
WV0340 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $8,729 $2,605 Implemented
WV0340 # 07 Y:2006 07 2006 USE SYNTHETIC LUBRICANT $3,001 $90 Implemented
WV0340 # 08 Y:2006 08 2006 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,647 $1,000 Implemented
WV0340 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,384 $800 Implemented
WV0340 # 10 Y:2006 10 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,262 $0 Implemented
WV0340 # 11 Y:2006 11 2006 DEVELOP A REPAIR/REPLACE POLICY $2,152 $439 Implemented
WV0340 # 12 Y:2006 12 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $928 $1,270 Implemented
WV0340 # 13 Y:2006 13 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $598 $1,170 Implemented